Trial runs on section 2A from Dahanukarwadi to Dahisar East has started from 31 May 2021. Dahisar East commercial operations began on 3 April 2022 with the First phase of line 2A.
Station layout
G
Street Level
Exit/Entrance
L1
Mezzanine
Fare control, station agent, Metro Card vending machines, crossover
Like all other stations and railways of Mumbai metro, Lower Oshiwara station also uses 25,000 volt AC power system by overhead catenary to operate the trains.