Following construction, the original lock walls settled and began to lean out of alignment, so a replacement lock was built. It was finished in 1948. A rehabilitation phase ran from 1987 to 1995. In 2009, Lock and Dam No. 2 became home to the nation's first commercial, federally licensed hydrokinetic power facility, which is a partnership between the City of Hastings and Hydro Green Energy, LLC of Westmont, IL.