List of wind farms in New South Wales

The wind resource potential in NSW is very good, yet this potential has remained largely untapped. The NSW Wind Atlas[1] shows that many of the sites with good potential for wind farms are situated on the western side of the Great Dividing Range. While the wind is also strong in coastal areas, wind farms are unlikely to be built there due to existing residential development and national park areas. NSW also has an extensive electricity transmission network, providing relatively good power grid access for new wind farms.

As of March 2015, there was 625 MW of wind power installed in NSW.[2] As of May 2019, there was 1493 MW of wind power installed in NSW.

To measure public attitudes to wind farms, the NSW government surveyed 2000 people and 300 businesses in rural NSW in late 2010. About 80 per cent of respondents said they would strongly support wind farms in their region.[3] Support dropped off somewhat if a wind farm was proposed closer to a person's house but 60 per cent still supported wind turbines within two kilometres of their house. About 13 per cent of people surveyed, many aged over 65, said they did not support wind power.[3]

Wind farms in New South Wales

Hampton Wind Farm

A list of operating and planned wind farms in New South Wales is below.

Operating

Project name Sponsoring company Coordinates Turbines Capacity (MW) Status Completion date Notes
Bango Wind Farm Wind Prospect / CWP 34°20′S 148°28′E / 34.34°S 148.47°E / -34.34; 148.47 46 244 Operating 2023 [4][5] First project in Australia to use General Electric 5.3 MW Turbines.
Biala Wind Farm BJCE Australia 31 110 Operating 2021 [6]
Blayney Wind Farm[7] Eraring Energy 33°37′19″S 149°11′54″E / 33.62194°S 149.19833°E / -33.62194; 149.19833 15 9.9 Operating 2000
Boco Rock Wind Farm[8] Wind Prospect / CWP 36°34′37″S 149°07′26″E / 36.577°S 149.124°E / -36.577; 149.124 67 113 Operating 2015 [9]
Bodangora Wind Farm[10] Infigen Energy 32°26′42″S 149°02′24″E / 32.445°S 149.04°E / -32.445; 149.04 33 113.2 Operating 2019 33 GE 3.4-130 Turbines[11]
Capital Wind Farm[12] Infigen Energy 35°08′45″S 149°34′02″E / 35.1458°S 149.5671°E / -35.1458; 149.5671 67 140.7 Operating 2009 [13]
Collector Wind Farm RATCH-Australia 34°51′S 149°23′E / 34.85°S 149.39°E / -34.85; 149.39 55 228 Operating 2021 [14]
Crookwell Wind Farm[15] Tilt Renewables[16] (formerly Eraring Energy) 34°27′25″S 149°28′19″E / 34.457°S 149.472°E / -34.457; 149.472 8 4.8 Operating 1998
Crookwell 2 Wind Farm[17] Unión Fenosa Wind Australia 34°32′28″S 149°34′12″E / 34.541°S 149.570°E / -34.541; 149.570 46 92 Operating 2018
Crudine Ridge Wind Farm Wind Prospect / CWP 32°56′35″S 149°40′41″E / 32.943°S 149.678°E / -32.943; 149.678 37 135 Operating 2021 [18]
Cullerin Range Wind Farm[19] Epuron (owned by EDL) 34°53′56″S 149°38′53″E / 34.899°S 149.648°E / -34.899; 149.648 15 30 Operating 2009 Developed by Epuron, Built by Origin, sold to EDL[20]
Gullen Range Wind Farm[21] Goldwind Australia / JNCEC 34°36′52.04″S 149°27′34.31″E / 34.6144556°S 149.4595306°E / -34.6144556; 149.4595306 73 165.5 Operating 2013
Gunning Wind Farm[22] Acciona 34°41′49″S 149°22′59″E / 34.697°S 149.383°E / -34.697; 149.383 31 46.5 Operating 2011
Hampton Wind Park[23] Wind Corporation Australia 33°38′20″S 150°02′58″E / 33.6388°S 150.0494°E / -33.6388; 150.0494 2 1.32 Operating 2001
Sapphire Wind Farm[24] CWP Renewables 29°45′S 151°29′E / 29.75°S 151.49°E / -29.75; 151.49 75 270 Operating 2018 Completed as of 31 October 2018.[25]
Silverton Wind Farm Epuron 31°58′S 141°28′E / 31.97°S 141.46°E / -31.97; 141.46 58 200 Operating 2019
Taralga Wind Farm CBD Energy/Banco Santander 34°25′37″S 149°51′28″E / 34.427076°S 149.857640°E / -34.427076; 149.857640 51 107 Operating 2015
White Rock Wind Farm Goldwind Australia/ CECEP 29°47′S 151°32′E / 29.78°S 151.54°E / -29.78; 151.54 70 175 (stage 1) Operating 2018 Approval for up to 119 WTGs.[26]
Woodlawn Wind Farm[27] Infigen Energy 35°05′02″S 149°37′12″E / 35.084°S 149.62°E / -35.084; 149.62 23 48.3 Operating 2011

Projects

Project name Sponsoring company Coordinates Turbines Capacity (MW) Status Completion date Notes
Black Springs Wind Corporation 33°50′28″S 149°42′36″E / 33.841°S 149.71°E / -33.841; 149.71 40 Cancelled
Bowmans Creek Wind Farm Epuron 32°15′47″S 151°05′53″E / 32.263°S 151.098°E / -32.263; 151.098 250+ Feasibility [28]
Conroys Gap Wind Farm Epuron 34°07′41″S 149°46′05″E / 34.128°S 149.768°E / -34.128; 149.768 30 Planning approved
Cooma Pacific Hydro 36°14′24″S 149°07′30″E / 36.24°S 149.125°E / -36.24; 149.125 100 Feasibility
Coppabella Wind Farm Epuron 34°44′10″S 148°33′18″E / 34.736°S 148.555°E / -34.736; 148.555 75 284 Planning approved Sold to Goldwind.[29]
Flyers Creek Wind Farm Infigen Energy 38 145 Under construction [30]
Granite Hills Wind Farm Akuo Energy 132 Feasibility [31]
Hills of Gold Wind Farm Wind Energy 98 400 Feasibility [32]
Jupiter Wind Farm EPYC Pty Ltd 350 Cancelled [33]
Kooragang, Newcastle EnergyAustralia 32°52′38.94″S 151°44′54.95″E / 32.8774833°S 151.7485972°E / -32.8774833; 151.7485972 0.6 Decommissioned
Liverpool Range Epuron 31°52′59″S 149°52′16″E / 31.883°S 149.871°E / -31.883; 149.871 267 1000 Planning approved
Lord Howe Island 31°33′S 159°05′E / 31.55°S 159.08°E / -31.55; 159.08 0.3 Feasibility
Molonglo Acciona Energy 35°13′55″S 149°26′46″E / 35.2319°S 149.446°E / -35.2319; 149.446 120 Cancelled
Mt Spring ActewAGL 33°23′53″S 149°09′07″E / 33.398°S 149.152°E / -33.398; 149.152 10 Cancelled
Paling Yards Unión Fenosa Wind Australia 35°08′38″S 149°01′19″E / 35.144°S 149.022°E / -35.144; 149.022 60 204 Feasibility [34]
Pottinger AGL Energy 34°42′S 144°30′E / 34.7°S 144.5°E / -34.7; 144.5 1300 Feasibility to EnergyConnect[35][36]
Rock Flat Creek Pacific Hydro 36°09′29″S 149°12′36″E / 36.158°S 149.21°E / -36.158; 149.21 100 Feasibility
Rye Park Wind Farm Epuron/Tilt 34°34′S 148°58′E / 34.57°S 148.96°E / -34.57; 148.96 92 276 Planning approved [37]
Snowy Plains Wind Farm (Berridale) Epuron 36°09′14″S 148°33′54″E / 36.154°S 148.565°E / -36.154; 148.565 26 Cancelled 2010[38]
Upper Hunter Energy Park Upper Hunter Energy Park Pty Ltd 34 Feasibility [39]
Uungula Wind Prospect / CWP 32°30′50″S 149°16′23″E / 32.514°S 149.273°E / -32.514; 149.273 125 400 Feasibility [40]

See also

References

  1. ^ "Archived copy" (PDF). Archived from the original (PDF) on 19 February 2011. Retrieved 22 May 2010.{{cite web}}: CS1 maint: archived copy as title (link)
  2. ^ AEMO Electricity Registration List
  3. ^ a b Ben Cubby (25 March 2011). "Turbines take their turn". Sydney Morning Herald.
  4. ^ "Project Description – Bango Wind Farm". bangowindfarm.com.au. Retrieved 30 August 2021.
  5. ^ Mazengarb, Michael (12 August 2019). "Huge Bango wind farm gets underway, to provide cheap power to Snowy Hydro". RenewEconomy. Retrieved 12 August 2019.
  6. ^ "Biala Wind Farm". Retrieved 30 August 2021.
  7. ^ "Blayney - Eraring Energy". Archived from the original on 12 November 2010. Retrieved 16 August 2010.
  8. ^ "Facts & figures - - Boco Rock Wind Farm". bocorockwindfarm.com.au. Archived from the original on 16 October 2009.
  9. ^ "SERREE". serree.org.au. Retrieved 1 July 2019.
  10. ^ "Bodangora Wind Farm | Iberdrola Energy".
  11. ^ "Bodangora - Infigen Energy". www.infigenenergy.com. Retrieved 22 September 2018.
  12. ^ "Our Business - Infigen Energy". www.infigenenergy.com. Archived from the original on 8 August 2011.
  13. ^ "NSW Wind Farms". Retrieved 22 September 2018.
  14. ^ "Collector Wind Farm". Collector Wind Farm. Retrieved 30 August 2021.
  15. ^ "Crookwell - Eraring Energy". Archived from the original on 29 September 2009. Retrieved 5 June 2010.
  16. ^ "Crookwell Wind Farm". Tilt Renewables. Retrieved 23 September 2019.
  17. ^ "Union Fenosa Wind Australia". Archived from the original on 6 March 2013. Retrieved 15 January 2013.
  18. ^ "Crudine Ridge Wind Farm". Crudine Ridge Wind Farm. Retrieved 30 November 2021.
  19. ^ "Electricity Generation - Origin Energy". 16 June 2021.
  20. ^ "Cullerin Range | Epuron". epuron.com.au. Retrieved 1 July 2019.
  21. ^ "Project Update « Gullen Range Windfarm". Archived from the original on 13 April 2013. Retrieved 15 January 2013.
  22. ^ "ACCIONA Australia - Gunning Wind Farm". www.acciona.com.au. Archived from the original on 21 April 2013.
  23. ^ "CEC - Hampton Wind Park". Archived from the original on 6 March 2012. Retrieved 17 December 2011.
  24. ^ "Welcome | Online Community Consultation | Sapphire Wind Farm". sapphirewindfarm.com.au. Retrieved 30 June 2016.
  25. ^ "Construction Update – Sapphire". www.sapphirewindfarm.com.au. Retrieved 11 November 2018.
  26. ^ "White Rock Wind Farm switches on turbines" (PDF). 10 July 2017. Retrieved 22 September 2018.
  27. ^ "Woodlawn Wind Farm - Infigen Energy". www.infigenenergy.com. Archived from the original on 18 May 2013.
  28. ^ "Bowmans Creek". epuron.com.au. Retrieved 13 November 2018.
  29. ^ "MEDIA RELEASE: Sale of Yass Valley (Coppabella) to Goldwind". 1 February 2017. Retrieved 22 September 2018.
  30. ^ "Wind Energy Projects - Infigen Energy". www.infigenenergy.com. Retrieved 13 November 2018.
  31. ^ "About – Granite Hills Wind Farm". Retrieved 1 July 2019.
  32. ^ "About the Project". hills-of-gold-energy. Retrieved 1 July 2019.
  33. ^ Vorrath, Sophie (19 March 2018). "Jupiter wind farm plans abandoned in face of community opposition". RenewEconomy. Retrieved 1 July 2019.
  34. ^ "Paling Yards Wind Farm" (PDF). Retrieved 13 November 2018.
  35. ^ "Pottinger Wind Farm | Planning Portal - Department of Planning and Environment". www.planningportal.nsw.gov.au.
  36. ^ "Massive renewables hub gets all clear from locals, but long distance activists complain about the view". RenewEconomy. 18 October 2024. seven neighbours within 10km .. no objections from anyone living within 20 kilometres
  37. ^ "Rye Park Wind Farm" (PDF). May 2018. Retrieved 22 September 2018.
  38. ^ "WindAction | Snowy Plains wind farm falls through". www.windaction.org. Retrieved 22 September 2018.
  39. ^ "Upper Hunter Energy Park". Pamada. Retrieved 1 July 2019.
  40. ^ "Planning and Approvals – Uungula Wind Farm". uungulawindfarm.com.au. Retrieved 22 September 2018.