Crosses South Dakota to Steele City, where it branches east through Kansas and Missouri to delivery points at Wood River and Patoka, Illinois, and south to delivery points at Cushing, Oklahoma and Houston and Port Arthur, Texas. Along the way at Patoka, Keystone delivers crude oil to the Plains terminal which facilitates delivery to local refineries via third party pipelines.
Project cancelled in June 2021 as a result of US President Biden revoking permits for the project on January 20, 2021, due to opposition from Native American tribes, climate activists, and the Democratic Party, as the Keystone XL pipeline will worsen pollution and climate change.
This is the NEB-regulated segment of the Portland-Montreal pipeline system. Moves crude from Atlantic to Suncor refinery at Montreal. Two of 3 pipelines decommissioned (12 & 18 inch). Only 24-inch in operation
Southern Lights
operating
180,000
Manhattan, IL
Edmonton, AB
Enbridge Southern Lights GP Inc.
1529 c
Moves diluent north; formed in 2010 by reversing 1465 km of former Enbridge Line 13 and constructing 1091 km of new pipeline in the U.S. It shares the Enbridge Mainline right-of-way.
Moves crude oil & petroleum products to Parkland Burnaby refinery & Suncor Burrard products terminal; moves crude oil to four refineries in Washington via connection at Sumas to Puget Sound Pipeline; moves crude oil to Asia and U.S. West coast via Westridge Marine Terminal in Burnaby. One of few to ship crude & products in one pipe
RPPs delivery at points including Oakville, Toronto, Ottawa, Maitland, Belleville, Cornwall, Kingston, Montreal, Dorval; operates bi-directionally between Toronto & Oakville. Three other petroleum products pipelines (two Sun-Canadian and Enbridge's Line 8) transport gasoline, diesel, heating oil and jet fuel to Toronto and other cities along the route.
Utopia / Cochin Eastern
operating
50,000
Harrison County, OH
Windsor, ON
Formerly the eastern part of Cochin. Moves ethane from new pipeline from a point in Harrison County to a connection with existing Kinder Morgan pipeline and facilities near Riga, Michigan.
Wascana
operating
40,000
Raymond Station, MT
Plains Terminal, Regina
Plains Midstream
173 c
Moves light crude from Bakken north to connect to Enbridge Mainline at Regina; prior to 2012 it was southbound
Westspur
operating
247,400
Alida, Steelman, Bryant, Midale, SK
Enbridge Mainline near Cromer, MB
TEML
511 c
Saskatchewan
Tundra Energy Marketing; Moves crude oil & condensate to Mainline; until Dec. 2106 owned by Enbridge
Sand Hills Pipeline: This pipeline is being developed by DCP Midstream. It will extend for 700 miles from West to East Texas and have an initial capacity of approximately 120,000 barrels per day.[2] The first segment of the pipeline opened in October 2012.[3]
Pecos River Pipeline: Developed by Bridger Group and Advantage Pipeline, the Pecos River Pipeline will provide a link from the Delaware Basin to the Gulf Coast. The pipeline will run from the Pecos, Texas, to Crane, Texas, where it will connect to the Longhorn Pipeline. The Pecos River Pipeline will have an initial capacity of 150,000 barrels per day.[4]
Sterling III Pipeline: Under development from Oneok Partners, the Sterling III Pipeline will extend from parts of Texas and Oklahoma in the Mid-Continent Region to the Gulf Coast, and have a capacity of approximately 193,000 barrels per day.[5]