List of Istanbul Metro stations
As of April 2023[update] , the Istanbul Metro has 144 stations in operation on eleven metro lines (150 including also the three funiculars operated by Metro İstanbul A.Ş.). 92 are on the European side while 52 are on the Asian side. The first stations to open were Aksaray , Emniyet—Fatih , Topkapı—Ulubatlı , Bayrampaşa—Maltepe , Sağmalcılar and Kocatepe all which opened on 3 September 1989 on the M1 . The system currently has 56 stations under construction, 1 station is reserved and 22 station is currently on hold.
Operational stations
Şişli station of the Istanbul Metro in front of Istanbul Cevahir , Europe's largest mall between 2005 and 2011.
Levent station of the Istanbul Metro
Gayrettepe subway station
Levent subway station
Haliç station on the Golden Horn Metro Bridge
Taksim subway station
Osmanbey subway station
Mahmutbey subway station
Kadıköy subway station
Bostancı subway station, the only station with 3 tracks in the M4.(Train by EUROTEM )
By district
District
Number of Stations
Stations
Line(s)
First Station(s)
Most Recent Station(s)
Ümraniye
13
Altınşehir , Çakmak , Çarşı , Dudullu , Huzur , Ihlamurkuyu , İmam Hatip Lisesi , İMES , MODOKO—KEYAP , Necip Fazıl , Parseller , Ümraniye , Yamanevler
15 December 2017
6 January 2023
Başakşehir
12
Başak Konutları , İkitelli Sanayi , Kayaşehir Merkez , MASKO , MetroKent , Olimpiyat , Onurkent , Siteler , Şehir Hastanesi , Toplu Konutlar , Turgut Özal , Ziya Gökalp Mahallesi
14 June 2013
8 April 2023
Bağcılar
12
15 Temmuz , Bağcılar Meydan , Göztepe Mahallesi , İSTOÇ , Kirazlı , Mahmutbey , Mimar Sinan , Molla Gürani , Oruç Reis , Üçyüzlü , Yenimahalle , Yıldıztepe
14 June 2013
18 March 2024
Kadıköy
10
Acıbadem , Ayşekadın , Ayrılık Çeşmesi , Bostancı , Emin Ali Paşa , Göztepe , Kadıköy , Kozyatağı , Ünalan , Yenisahra
17 August 2012
6 January 2023
Bakırköy
9
Ataköy , Ataköy—Şirinevler , Atatürk Havalimanı , Bakırköy , Bakırköy Sahil , DTM—İstanbul Fuar Merkezi , Özgürlük Meydanı , Yenibosna , Zeytinburnu
31 January 1994
18 March 2024
Sarıyer
8
Aşiyan , Atatürk Oto Sanayi , Darüşşafaka , Hacıosman , İTÜ—Ayazağa , Sanayi , Seyrantepe , Vadistanbul
31 January 2009
28 October 2022
Eyüpsultan
8
Alibeyköy , Çırçır , Göktürk , Hasdal , İhsaniye , Kemerburgaz , Veysel Karani—Akşemsettin , Yeşilpınar
28 October 2020
2 January 2023
Beşiktaş
7
4. Levent , Boğaziçi Üniversitesi , Etiler , Fulya , Levent , Nispetiye , Yıldız
16 September 2000
2 January 2023
Fatih
6
Aksaray , Emniyet—Fatih , Haliç , Topkapı—Ulubatlı , Vezneciler , Yenikapı
3 September 1989
15 February 2014
Üsküdar
6
Altunizade , Bağlarbaşı , Bulgurlu—Libadiye , Fıstıkağacı , Kısıklı , Üsküdar
15 December 2017
15 December 2017
Pendik
6
Fevzi Çakmak—Hastane , Kurtköy , Pendik , Sabiha Gökçen Havalimanı , Tavşantepe , Yayalar—Şeyhli
10 October 2016
2 October 2022
Bahçelievler
6
29 Ekim Cumhuriyet , Bahçelievler , Çobançeşme , Doğu Sanayi , Haznedar , İlkyuva
31 January 1994
18 March 2024
Sancaktepe
5
Meclis , Samandıra Merkez , Sancaktepe , Sancaktepe Şehir Hastanesi , Sarıgazi
16 March 2024
16 March 2024
Maltepe
5
Esenkent , Gülsuyu , Huzurevi , Küçükyalı , Maltepe
17 August 2012
17 August 2012
Arnavutköy
5
Arnavutköy Hastane , İstanbul Havalimanı , Kargo Terminali , Taşoluk , Terminal 2
22 January 2023
19 March 2024
Bayrampaşa
4
Bayrampaşa—Maltepe , Kocatepe , Otogar , Sağmalcılar
3 September 1989
31 January 1994
Beyoğlu
4
Haliç , Kabataş , Şişhane , Taksim
16 September 2000
15 February 2014
Ataşehir
4
İçerenköy , Kayışdağı , Küçükbakkalköy , Mevlana
6 January 2023
6 January 2023
Kartal
4
Hastane—Adliye , Kartal , Soğanlık , Yakacık—Adnan Kahveci
17 August 2012
10 October 2016
Kağıthane
4
4. Levent , Çağlayan , Kağıthane , Nurtepe
28 October 2020
22 January 2023
Şişli
4
Gayrettepe , Levent , Osmanbey , Şişli—Mecidiyeköy
16 September 2000
29 January 2024
Esenler
4
Esenler , Giyimkent—Tekstilkent , Menderes , Oruç Reis
18 December 1989
28 October 2020
Gaziosmanpaşa
3
Karadeniz Mahallesi , Kâzım Karabekir , Yenimahalle
28 October 2020
28 October 2020
Güngören
3
Davutpaşa—YTÜ , Merter , Terazidere
31 January 1994
31 January 1994
Küçükçekmece
3
Atatürk Mahallesi , Bahariye , Halkalı Caddesi
29 May 2021
18 March 2024
Çekmeköy
1
Çekmeköy
21 October 2018
21 October 2018
Under construction stations
There are 50 stations under construction.
Planned stations
External links