Ahmedabad Metro is the 12th metro system in India.
It was built and is operated by the Gujarat Metro Rail Corporation Limited. Its first section was inaugurated on 4 March 2019[1] and opened to the public on 6 March 2019, with the East-West Corridor.[2][3] The 1.4 km-long Thaltej-Thaltej Gam section and three metro stations (Kankaria East, Thaltej Gam and Sabarmati) will be completed by December 2023.[4][5][6][7] The rest of the Phase-1 was inaugurated on 30 September 2022.[8] The East-West corridor and the North-South corridor were opened to public on 2 October 2022 and 6 October 2022 respectively.[9][10]