Lake Margaret Power Station

Lake Margaret Dam
Lake Margaret Power Station is located in Tasmania
Lake Margaret Power Station
Location of the Lake Margaret Dam in Tasmania
CountryAustralia
LocationWestern Tasmania
Coordinates41°59′24″S 145°34′48″E / 41.99000°S 145.58000°E / -41.99000; 145.58000
PurposePower
StatusOperational
Construction began1914 (1914)
Opening date1918 (1918)
Owner(s)Hydro Tasmania
Dam and spillways
Type of damGravity dam
ImpoundsYolande River
Height17 metres (56 ft)
Length243 metres (797 ft)
Dam volume6×10^3 m3 (210×10^3 cu ft)
Spillways1
Spillway typeUncontrolled
Spillway capacity29 m3/s (1,000 cu ft/s)
Reservoir
CreatesLake Margaret
Total capacity15,374 megalitres (542.9×10^6 cu ft)
Catchment area21 square kilometres (8.1 sq mi)
Surface area15.83 hectares (39.1 acres)
Lake Margaret Power Station
Coordinates41°59′24″S 145°34′48″E / 41.99000°S 145.58000°E / -41.99000; 145.58000
Operator(s)Hydro Tasmania
Commission date
  • 1914 (1914) (A, B, C & D);
  • 1918 (1918) (E & F);
  • 1930 (1930) (G);
  • 2009 (2009) (recommission A-G)
Decommission date2006 (2006) (A-G)
Type
Hydraulic head325 metres (1,066 ft)
Turbines
Installed capacity8.4 megawatts (11,300 hp)
Annual generation69 gigawatt-hours (250 TJ)
Website
hydro.com.au/energy/our-power-stations/king-yolande
[1]

The Lake Margaret Power Stations comprise two hydroelectric power stations located in Western Tasmania, Australia. The power stations are part of the King – Yolande Power Scheme and are owned and operated by Hydro Tasmania. Officially the Upper Lake Margaret Power Station, a conventional hydroelectric power station, and the Lower Lake Margaret Power Station, a mini-hydroelectric power station, the stations are generally collectively referred to in the singular format as the Lake Margaret Power Station. The stations are located approximately 2.5 kilometres (1.6 mi) apart.

The Upper Lake Margaret Power Station was constructed by the Mount Lyell Mining and Railway Company between 1911 and 1914. The 'concrete dam, pipeline, power house, transmission lines and all the necessary machinery were erected ... under the supervision of George [W.] Wright' Chief Mechanical Engineer.[2] In 1984, the station was sold to the Tasmanian Hydro-Electric Commission and was officially decommissioned in 2006 and, after a multimillion-dollar refit, was recommissioned in 2009.[3][4][5] The Lower Lake Margaret Power Station was built also by the Mount Lyell Mining and Railway Company in 1931 and decommissioned in 1995. After the implementation of a mini-hydro project in 2009, the project was recommissioned in 2010.[6]

Technical details

Part of the King – Yolande scheme that comprises three hydroelectric power stations, the Lake Margaret Power Stations utilise water from the naturally-forming Lake Margaret which was dammed in 1914 to increase the storage volume and head. A key feature of the development is a 2.2-kilometre (1.4 mi)-long woodstave pipeline which connects the dam to a steel penstock which feeds the power station. In 2009 a new pipeline of Alaskan Yellow Cedar replaced the native King Billy Pine pipeline constructed in 1937.[7]

The upper power station was recommissioned in 2009 by Hydro Tasmania and has six 1.2-megawatt (1,600 hp) Boving Pelton-type turbines and one 1.2-megawatt (1,600 hp) James Gordon Pelton-type turbine with a combined generating capacity of 8.4 megawatts (11,300 hp) of electricity. Within the station building, each of the seven horizontal axis turbines are connected to open wheel generators. The first four machines were installed in 1914. Two more were added in 1918 and a seventh machine was added in 1930. Each turbine is fitted with a motorised inlet valve. The generators are connected to individual machine circuit breakers which are connected to circuit breakers for each of the four transmission circuits contained in a split bus.[7] The station output is estimated to be 48 gigawatt-hours (170 TJ) annually.[1]

The lower power station was recommissioned in 2010 by Hydro Tasmania and has a three-jet Turgo turbine with a generating capacity of 3.2 megawatts (4,300 hp) of electricity. Water is delivered to the station via a 1.9-kilometre (1.2 mi) wood stave pipeline and 254-metre (833 ft) Fibre Reinforced Plastic penstock. The station output is estimated to be 21 gigawatt-hours (76 TJ) annually.[6]

History

In 1911 the Mount Lyell Mining and Railway Company decided to make more extensive use of electricity in its smelting operations in the mining town of Queenstown, on Tasmania's west coast. It selected Lake Margaret, a small lake high up on Mount Sedgwick, to the north-west of the town, as its catchment area.

In 1911, construction of a dam was commenced, which raised the original lake by 6 metres (20 ft). The water was originally conveyed from the dam via a 2.2 kilometres (1.4 mi) wood stave pipeline. The Australian Woodpipe Company was consulted and employed to construct the wooden pipeline. The Mount Lyell Mining & Railway Company determined that not only was a wooden pipeline cheaper to construct, but it was also more efficient and durable than iron or steel. The local native Tasmanian timber King Billy Pine was studied but it was decided not to be suitable.

With regard to King William Pine, we are sorry to say that we do not consider this at all suitable for the purpose of pipe construction on account of its lack of uniform density. We did prepare an estimate for constructing the pipe at your Works from Pine to be supplied by you, and our estimate actually worked out at a lower figure than that of your engineers, but we feel that we would not like to be associated with the manufacture of a pipe made from this timber. We regret being compelled to arrive at this decision because we have been searching Australasia for a suitable timber, and thought that the Pine in question might have answered the purpose.

— Albert G. McDonald, an interstate representative for the Australian Woodpipe Company, in a letter to Robert Carl Sticht, the General Manager of the Mount Lyell Mining & Railway Co Ltd, 13 June 1913.

The wood stave pipeline was subsequently constructed from Oregon Pine (Douglas Fir), which was imported from Canada. The timber was shipped to the west coast town of Strahan and was transported to the Lake Margaret precinct via the Abt Railway. This pipeline rapidly deteriorated and in 1938 was replaced by a King Billy Pine wood stave pipeline, with the timber sourced locally. This pipeline was still in service until the 30 June 2006 closure of the Lake Margaret Power Scheme.

The wood stave pipeline originally joined two 29-inch-diameter (740 mm) steel penstock pipes which dropped 330 metres (1,080 ft) to the power station building in the Yolande Valley below. Due to the efficiency of the scheme another penstock pipe was added in 1919. Due to internal deterioration these pipes were replaced in 1969 with a single 48-inch-diameter (1,200 mm) steel pipe, by contractor John Holland. This replacement coincided with major refurbishment of the power station building, renewal of sections of the Lower Power Scheme wood stave pipeline, replacement of the transmission lines between the power station and the Queenstown substation, and post-stressing of the Lake Margaret dam wall.

The Lake Margaret Lower Power Scheme was opened in 1931. Showcasing the ingenuity and resourcefulness of the men in charge at the time, it was located downstream from the main power station and utilised water that had already powered the turbines in the main station. It housed a single Boving-Francis type turbine which, whilst having to be manually started, could be remotely controlled from the main power station, demonstrating a unique system that is considered significant in the history of power generation in Tasmania and Australia. The Lower Power Scheme was mothballed in the early 1990s.

Closure

The power plant itself produced 8.4 megawatts (11,300 hp) of peak power from seven Pelton turbines, with an average output of 5.5 megawatts (7,400 hp) (limited by rainfall into the catchment), four of which were in service from when the building opened in 1914, two since 1919 and the 7th since 1930.

Throughout 2005 the old plant was still in full-time use, but became the subject of debate. The Lake Margaret Precinct and Power Station were nominated for inclusion in the state heritage register due to the unique nature of the station's role as an integral part of West Coast history that has not been closed down or destroyed – the fate of many of the man made structures on the west coast that no longer serve purposes for the mining or other industries.

On 30 June 2006 the Lake Margaret Power Station closed, due to the cost and increasing difficulty of maintaining the decrepit King Billy Pine pipeline. In the days immediately before closure, five machines were operating at full output, one was idle due to insufficient water pressure and another out of service due to requiring replacement turbine buckets.[8]

At the time of closure the pipeline was estimated to be losing 10% of the water it carried due to leakage. During early 2007 the extent of leakage was sufficient of itself to draw down the level in Lake Margaret by around 10% during a period of very low rainfall. At this time the pipeline was still under pressure although the power station remained closed.

Hydro Tasmania proposed refurbishment of the scheme with a return to operation around 2009–10. Community consultation found a strong preference for refurbishment using the existing machines plus a new wood stave pipeline rather than the use of new machines or a steel pipe.

Any reuse of the existing machinery would likely involve the installation of automatic shutdown capability to avoid the need for 24-hour manning of the power station in order to improve the economics of refurbishment. All of Tasmania's other major hydro-electric power stations were either originally built to operate unmanned (standard procedure for new power stations in Tasmania since the 1950s) or have been refurbished in recent years to enable unmanned operation.

Back to Lake Margaret Day

Activities inside the village hall during the Back To Lake Margaret Day in 2007.

On 18 March 2007 Hydro Tasmania hosted the 'Back to Lake Margaret Day' at the Lake Margaret Hydro-Electric Scheme. The event was an open invitation to all people interested in the past and future of the Lake Margaret scheme. Previous residents and employees were invited to attend, and the day was officially opened by Alex Wilkinson, the oldest known person who has an association with the scheme.

During the day the mothballed power station was open for inspection, as were two of the empty c. 1914 cottages which had formerly housed many of the attendees at the event. The village hall was a hive of activity during the day, with aged photographs being pinned the walls and people reminiscing about their time at Lake Margaret. The date was chosen to coincide with the Mount Lyell Twenty-Five Year Reunion Dinner, which was held in Queenstown on the same weekend and included many past employees who also have an association with Lake Margaret. About 200 people attended the Back To Lake Margaret Day.[9]

Reopening

In June 2008 a decision was made to return the Lake Margaret Power Station back to operational capacity. Following the various public and other efforts - the Lake Margaret system was reopened in 2009.[10] The refurbishment included rebuilding the 2.2 kilometres (1.4 mi) wood stave penstock for the Upper Power Station.[11][12] The upper power station was reopened on 12 November 2009, and the lower power station on 23 July 2010.[5][13]

2014 Queenstown Heritage and Arts Festival

In October 2014, the Queenstown Heritage and Arts Festival (now known as The Unconformity) programme included events and arts works at the Lake Margaret precinct.[14]

Engineering heritage award

The power scheme received a Historic Engineering Marker from Engineers Australia as part of its Engineering Heritage Recognition Program.[15]

See also

References

  1. ^ a b "Register of Large Dams in Australia". Dams information. Australian National Committee on Large Dams. 2010. Archived from the original (Excel (requires download)) on 12 December 2013. Retrieved 23 June 2015.
  2. ^ Porter, Kenneth Wiggins (December 1955). "The Peaks of Lyell. By Geoffrey Blainey. Victoria, Australia, Melbourne University Press, 1954; New York, Cambridge University Press, 1955. Pp. x + 310. $5.00". Business History Review. 29 (4): 371–373. doi:10.2307/3111866. ISSN 0007-6805.
  3. ^ Ford, Sean (12 November 2009). "Lake Margaret Power Station reopened". The Advocate. Tasmania. Retrieved 21 June 2015.
  4. ^ "The redeveloped Lower Lake Margaret power station near Queenstown was officially opened today by the Minister for Energy and Resources Bryan Green" (Press release). Hydro Tasmania. 23 July 2010.
  5. ^ a b Mathers, P. (2010). "Lake Margaret Power Scheme: a long history and assured future". Australian Journal of Electrical & Electronics Engineering (Heritage paper report). 7 (1). The Institution of Engineers, Australia (published 1 February 2010): 89(11). doi:10.1080/1448837X.2010.11464261. ISSN 1448-837X. S2CID 111504167.
  6. ^ a b "Lower Lake Margaret mini hydro: Technical fact sheet" (PDF). King - Yolande Catchment. Hydro Tasmania. Retrieved 6 July 2015.
  7. ^ a b "Upper Lake Margaret Power Station: Technical fact sheet" (PDF). King - Yolande Catchment. Hydro Tasmania. Archived from the original (PDF) on 22 March 2015. Retrieved 6 July 2015.
  8. ^ "Heritage listing complicates decommission plans". International Water Power & Dam Construction (World news, Hydro Tasmania). 58 (9). Progressive Media Markets Ltd: 8(1). 1 September 2006. ISSN 0306-400X.
  9. ^ Mathers, Phil (June 2007). "NOMINATION OF LAKE MARGARET POWER SCHEME FOR A HISTORIC ENGINEERING MARKER" (PDF). engineersaustralia.org.au. Engineering Heritage Tasmania. p. 9. Retrieved 16 April 2020.
  10. ^ "Innovation and heritage feature lower Lake Margaret redevelopment" (Press release). Hydro Tasmania. July 2010.
  11. ^ "$3500 a m timber pipeline replaces worlds' biggest soaker hose". The Earthmover and Civil Contractor. August 2009. Retrieved 4 February 2012.
  12. ^ Atherton, Grant (2010). "Lake Margaret Hilltop Pipeline Replacement". 5th Civil Engineering Conference in the Asian Region and Australasian Structural Engineering Conference 2010, the. Engineers Australia: 944–950. ISBN 978-0-646-53727-6.
  13. ^ Mainwaring, Ross (February 2012). "The past becomes the present: wooden rails and pipe dreams". Light Railways (223): 16–23.
  14. ^ Page 4 re the events, page 2 Paradise Lost? by Frank Martin, a former resident of Lake Margaret village -Queenstown Heritage & Arts Festival (Tas.) (issuing body.) (2014), Queenstown Heritage & Arts Festival : no ordinary place. no ordinary festival, [Queenstown, Tasmania] Queenstown Heritage & Arts Festival, retrieved 14 October 2016
  15. ^ "Lake Margaret Hydro-electric Scheme, 1914-". Engineers Australia. Retrieved 2 May 2020.

Further reading

Read other articles:

Atsushi Hashimoto (橋本 淳code: ja is deprecated , Hashimoto Atsushi, lahir 14 Januari 1987) adalah seorang aktor asal Jepang. Dia mulai berkarier di dunia film sejak tahun 2004, dan dia dikenal dengan peran-perannya dalam serial tokusatsu dan drama: sebagai Kai Ozu / MagiRed dalam serial Super Sentai Mahou Sentai Magiranger, sebagai Yuichi Ezaki dalam Hanbun no Tsuki ga Noboru Sora, dan sebagai Hosomatsu / Raiden dalam Chou Ninja Tai Inazuma!. Atsushi Hashimoto sekarang berada di bawah ma...

 

Bill's Gamblin' Hall and Saloon Fakta dan statistik Alamat 3595 Las Vegas Blvd South Las Vegas, NV 89109Tanggal pembukaan 1979Nama sebelumnya Barbary Coast Hotel and CasinoJenis kasino TanahTema San Francisco 1890-anPemilik Harrah's EntertainmentJumlah kamar 197Luas perjudian 30,000 square feetAcara permanen Hiburan lounge bebasAtraksi menarik Big Elvis, replika Elvis Presley seberat 500 ponRestoran terkenal Drai'sThe Steakhouse at Bill’s The Victorian Ro...

 

Templat:Citations missing Logo asli perusahaan San Pedro,Los Angeles & Salt Lake Railroad. San Pedro, Los Angeles and Salt Lake Railroad (SP,LA&SL) merupakan perusahaan kereta api yang tak beroperasi yang menyelesaikan dan mengoperasikan sebuah jalur kereta antara kota-kota di namanya, melalui Las Vegas, Nevada. Incorporated (Utah) tahun 1901 dengan nama San Pedro, Los Angeles and Salt Lake Railroad, jalur ini diciptakan oleh William Andrews Clark, seorang pengusaha pertambangan Monta...

New Hampshire gubernatorial election 1843 New Hampshire gubernatorial election ← 1842 14 March 1843 1844 →   Nominee Henry Hubbard Anthony Colby Party Democratic Whig Popular vote 23,050 12,553 Percentage 51.58% 28.09%   Nominee John H. White Daniel Hoit Party Conservative Liberty Popular vote 5,597 3,392 Percentage 12.53% 7.59% Governor before election Henry Hubbard Democratic Elected Governor Henry Hubbard Democratic Elections in New Hampshire Feder...

 

Rex cornish Asal  Inggris Standar ras TICA standar FIFe standar WCF standar CFA standar ACF standar GCCF standar CCA standar AACE standar ACFA/CAA standar Kucing domestik (Felis catus) Rex cornish adalah salah satu ras kucing domestik berbulu pendek, bahkan sangat pendek, dan keriting, yang terjadi akibat adanya mutasi genetik pada nenek moyang mereka, yaitu seekor anak kucing yang terlahir sekitar tahun 1950-an di sebuah area pertanian di Cornwall, Inggris. Maka dari itu kucing jenis i...

 

Menzingencomune Menzingen – Veduta LocalizzazioneStato Svizzera Cantone Zugo DistrettoNon presente AmministrazioneLingue ufficialiTedesco TerritorioCoordinate47°10′50″N 8°35′30″E / 47.180556°N 8.591667°E47.180556; 8.591667 (Menzingen)Coordinate: 47°10′50″N 8°35′30″E / 47.180556°N 8.591667°E47.180556; 8.591667 (Menzingen) Altitudine805 m s.l.m. Superficie27,50 km² Abitanti4 467 (2016) Densità162,44 ab...

古斯塔夫·胡萨克Gustáv Husák捷克斯洛伐克共产党中央委员会总书记(1969-1971年称第一书记)任期1969年4月17日—1987年12月17日(18年244天)前任亞歷山大·杜布切克继任米洛什·雅克什捷克斯洛伐克总统任期1975年5月29日—1989年12月10日(14年195天)前任卢德维克·斯沃博达继任瓦茨拉夫·哈维尔 个人资料出生(1913-01-10)1913年1月10日 奥匈帝国布拉迪斯拉发杜布拉夫卡逝世1991年11...

 

 烏克蘭總理Прем'єр-міністр України烏克蘭國徽現任杰尼斯·什米加尔自2020年3月4日任命者烏克蘭總統任期總統任命首任維托爾德·福金设立1991年11月后继职位無网站www.kmu.gov.ua/control/en/(英文) 乌克兰 乌克兰政府与政治系列条目 宪法 政府 总统 弗拉基米尔·泽连斯基 總統辦公室 国家安全与国防事务委员会 总统代表(英语:Representatives of the President of Ukraine) 总...

 

  لمعانٍ أخرى، طالع بندق (توضيح). بندق حبتا بندق، بندقة بقشرة (يساراً)، بندقة بدون قشرة (يمينا) القيمة الغذائية لكل (100 غرام) حجم الحصة 100g الطاقة الغذائية 2,629 كـجول (628 ك.سعرة) الكربوهيدرات 16.7 نشا 0.48 السكر 4.34 ألياف غذائية 11 البروتين بروتين كلي 14.95 ماء ماء 5.31 الدهون دهون ...

Joseph M. Acaba This is a list of notable Puerto Rican scientists involved in the United States Space Program, also known as the National Aeronautics and Space Administration (NASA) and their contributions to said program. This list is not limited to Puerto Ricans born in Puerto Rico, it also includes people of Puerto Rican descent born elsewhere. According to an article written by Margarita Santori Lopez for the official newspaper of the University of Puerto Rico's Mayagüez Campus, Prensa ...

 

Lower house of the Parliament of Ireland that existed from 1297 until 1800 For the current house of representatives in Ireland, see Dáil Éireann. For the body which existed between 1921 and 1922, see House of Commons of Southern Ireland. Irish House of CommonsTypeTypeLower house HistoryEstablished1297Disbanded1 January 1801Succeeded byHouse of Commons of the United KingdomLeadershipSpeaker of the HouseJohn Foster (1785–1800) Seats300[a]ElectionsVoting systemFirst past the pos...

 

 CC20 Stasiun MRT Farrer Road花拉路地铁站பேரர் சாலைStesen MRT Farrer RoadAngkutan cepatPlatform level Stasiun MRT Farrer Road.Lokasi71 Farrer RoadSingapore 261006Koordinat1°19′02″N 103°48′27″E / 1.317319°N 103.807431°E / 1.317319; 103.807431OperatorSMRT Trains (SMRT Corporation)Jalur  Jalur Lingkar Jumlah peronIslandJumlah jalur2LayananBus, TaksiKonstruksiJenis strukturBawah tanahTinggi peron2Akses difabelYesInfor...

Kara-Suu adalah kota dengan jumlah penduduk 30.000 jiwa yang wilayahnya terbagi menjadi dua. Separuh bagian merupakan wilayah Uzbekistan bagian timur dan separuh lagi masuk ke wilayah Kirgizia. Kedua negara ini dipisahkan oleh Sungai Shakhrikhan-Say yang menjadi garis perbatasannya. Jarak kota Kara-Suu dari Andijan di Uzbekistan sekitar 50 km. Kara-Suu adalah kota kedua di Uzbekistan yang ditutup selama kerusuhan 13 Mei 2005, setelah 6.000 warga Uzbekistan mengungsi ke Kirgizia melalui k...

 

Мексиканская либеральная партия Основана 28 сентября 1905[1] Упразднена 1927 Штаб-квартира Мехико, Мексика Страна  Мексика Идеология Левые/крайне левые: анархо-коммунизм, магонизм, аграризм  Медиафайлы на Викискладе Обложка «Рехенерасьон» (Regeneración), официального печ...

 

2012 video game This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Darksiders II – news · newspapers · books · scholar · JSTOR (November 2020) (Learn how and when to remove this message) 2012 video gameDarksiders IIDeveloper(s)Vigil Games[a]Publisher(s)THQ[b]Director(s)Joe MadureiraDavid AdamsMa...

2022 book by Dinesh Thakur and Prashant Reddy The Truth Pill: The Myth of Drug Regulation in India AuthorsDinesh Singh ThakurPrashant Reddy ThikkavarapuLanguageEnglishSubjectsBioethicsDrug policyHealth lawGenreNonfictionPublisherSimon & Schuster IndiaPublication date10 October 2022Publication placeIndiaMedia typePrint (hardback), DigitalPages508ISBN9789392099175Websitethetruthpill.in The Truth Pill: The Myth of Drug Regulation in India is a 2022 book by whistleblower Dinesh Thakur an...

 

1941–1944 client state of the Axis Powers Not to be confused with the Hellenic Republic. For other uses, see Hellenic State. This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Hellenic State 1941–1944 – news · newspapers · books · scholar · JSTOR (May 2022) (Learn how and when to remove this message) H...

 

Jalur 2, Beijing Subway Line 2二号线 IkhtisarJenisAngkutan cepatSistemBeijing SubwayStatusOperasionalStasiun18Penumpang harian1.168.400 (2014 Avg.)[1] 1,529,800 (2014 puncak)[2]OperasiDibuka1971OperatorBeijing Mass Transit Railway Operation Corp., LtdKarakteristik lintasbawah tanahDepoTaipenghu Depot[3]Data teknisPanjang lintas23.1 kmLebar sepur1.435 mm (4 ft 8+1⁄2 in) Peta rute Jalur melingkar Utara ke Chegongzhuang [{{fullurl:{{{1}}}|acti...

Pour les articles homonymes, voir Gigliotti et Orlando. OrlandoOrlando avec sa sœur Dalida en 1963.BiographieNaissance 29 juillet 1936 (88 ans)Le Caire (royaume d'Égypte)Pseudonymes Orlando, Bruno Mory, برونو موريNationalités italiennefrançaiseActivités Producteur ou productrice de disques, chanteur, éditeur musical, acteurPériode d'activité 1965-1987Père Pietro Gigliotti (d)Mère Giuseppina Gigliotti (d)Fratrie Orlando Gigliotti (d)DalidaAutres informationsA travaill�...

 

National park in Finland Syöte National ParkIUCN category II (national park)Location in FinlandLocationFinlandCoordinates65°44′51″N 27°54′43″E / 65.74750°N 27.91194°E / 65.74750; 27.91194Area299 km2 (115 sq mi)Established2000Visitors40000 (in 2009[1])Governing bodyMetsähallitusWebsitewww.outdoors.fi/syotenp Syöte National Park (Syötteen kansallispuisto) is a national park in the area of Pudasjärvi, Posio and Taivalk...