Kuril Flyover

Kuril Flyover
Kuril Flyover drone view
Coordinates23°49′20″N 90°25′14″E / 23.8223°N 90.4206°E / 23.8223; 90.4206
LocaleDhaka
Characteristics
Total length3.1 km
History
Constructed byProject Builders Limited, China Major Bridge Engineering Corporation
Construction start2 May 2010
Construction end4 August 2013
Construction cost3.06 billion taka[1]
Location
Map

The Kuril Flyover is the third largest flyover in Bangladesh. Its foundation stone was laid on 2 May 2010.[1][2][3] Finally the work started in March 2011.[4]

The flyover was opened on 4 August 2013.[1]

Kuril Flyover

References

  1. ^ a b c "PM opens Kuril Flyover". bdnews24.com. Retrieved 10 December 2020.
  2. ^ "PM inaugurates Kuril flyover". The Daily Star. Retrieved 10 December 2020.
  3. ^ "PM to open Kuril Flyover on Sunday". Dhaka Tribune. Retrieved 10 December 2020.
  4. ^ "Kuril flyover open for public". Risingbd.com. Retrieved 10 December 2020.