You can help expand this article with text translated from the corresponding article in Portuguese. (December 2014) Click [show] for important translation instructions.
View a machine-translated version of the Portuguese article.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Portuguese Wikipedia article at [[:pt:Usina Hidrelétrica de Jaguara]]; see its history for attribution.
You may also add the template {{Translated|pt|Usina Hidrelétrica de Jaguara}} to the talk page.
The Jaguara Dam is an embankment dam on the Grande River about 6 kilometres (3.7 mi) north of Rifaina, Brazil. The dam is on the border of Conquista municipality in the state of Minas Gerais to the north and Rifaina municipality in the state of São Paulo to the south. It was constructed between 1966 and 1971 for the purpose of hydroelectric power generation. The power station at the dam has an installed capacity of 424 megawatts (569,000 hp) and is owned by CEMIG.[2]