The New Lots Line is served by the 3 at all times except late nights, when the 4 takes over service. Limited service is also provided by the 2, 4, and 5 during rush hours.
The New Lots Line is entirely elevated and consists of seven stations; most of the line has two tracks, except for Junius Street station, which has three tracks. It runs mostly above Livonia Avenue in Brownsville and East New York, except for a short section above East 98th Street in Brownsville. The line is served by the 3 train at all times except late nights, when the 4 train takes over service. During rush hours, occasional 2, 4, and 5 trains also serve the line.
The New Lots Line was built as a part of Contract 3 of the Dual Contracts between New York City and the Interborough Rapid Transit Company. The first portion of the line between Utica Avenue and Junius Street opened on November 22, 1920, with shuttle trains operating over this route. The line opened one more stop farther to the east to Pennsylvania Avenue on December 24, 1920. Service was extended to New Lots Avenue on October 16, 1922. In 1968, as part of the proposed Program for Action, the IRT New Lots Line would have been extended past New Lots Avenue toward Spring Creek, but the plan was never completed. Stations on the line were rebuilt several times throughout the years.
History
Planning
In 1913, New York City, the Brooklyn Rapid Transit Company, and the Interborough Rapid Transit Company (IRT) reached an agreement, known as the Dual Contracts, to drastically expand subway service across New York City. As part of Contract 3 of the agreement, between New York City and the IRT, the original subway opened by the IRT in 1904 to City Hall,[3] and extended to Atlantic Avenue in 1908,[4] was to be extended eastward into Brooklyn.[5] The line was to be extended along Flatbush Avenue and Eastern Parkway to Buffalo Street as a four-track subway line, and then along East 98th Street and Livonia Avenue to New Lots Avenue as an elevated two-track line, with provisions for the addition of a third track. In addition, a two-track branch line along Nostrand Avenue branching off east of the Franklin Avenue station was to be constructed.[6]
The underground portion of the line became known as the Eastern Parkway Line, or Route 12, while the elevated portion became known as the New Lots Line. This section was constructed as an elevated line because the ground in this area is right above the water table, and as a result the construction of a subway would have been prohibitively expensive.[7] This line was constructed as Route 31, the Livonia Avenue Route.[8] In 1914, several studies of the line had been completed.[9] At the end of 1916, contract drawings for the line were completed, and the working drawings were being prepared. While preliminary studies for the construction of a yard along the line were completed, its locations were not yet decided upon.[10]: 192–193 On April 16, 1916, the New York State Public Service Commission (PSC) denied a request by the Chief Engineer of the IRT for the installation of a third track on the line to provide necessary space for train storage. The request was turned down because it would have required the acquisition of additional steel and because the legal routing of Route 31 did not specify the construction of a third track along the line.[11] On May 9, 1916, title was acquired to sixteen parcels of land between the intersection of Eastern Parkway and Buffalo Street and East New York Avenue opposite of East 98th Street in condemnation proceedings to complete the line.[10]: 136
Construction
Bids were opened for the construction of the line on May 23, 1916.[10]: 193 Six bids on the project were received, and, on June 1, 1916, the contract was awarded to Dennis E. Conners, who submitted the low bid of $1,376,122. The high bid to build the line was for $1,467,000.[12] Work on the project had to be completed by June 1, 1917.[13] On June 5, the PSC accepted bids for 52,756 tons of structural steel to be used on multiple subway extensions to be completed as part of the Dual Contracts,[10]: 109–110 of which 15,100 tons of the steel were for the Livonia Avenue extension.[14] The PSC put this contract out to determine whether it was possible to let separate contracts for the steel by line, given that the price of steel was rapidly increasing. Three bids were submitted, but the Chief Engineer recommended that they all be rejected, because he anticipated that the price of steel would stop rising rapidly and instead start decreasing,[10]: 109–110 and because the city had found a cheaper way to procure steel.[15] On June 8, the award of the construction of the line to Conners was rescinded.[10]: 109–110 [15] Conners sent a letter to the PSC on June 20, agreeing to reduce his bid for steel by $20,000. The PSC subsequently rejected the three bids; it readvertised bids for the steel work and its erection, or just for the erection of the steel at the end of 1916.[10]: 110
A new contract for the construction of the line was awarded by the PSC on January 17, 1917, in two parts. The contract for the steel was awarded to American Bridge Company for $1,431,755, and the contract for the erection of the structure was awarded to W.G. Cooper for $257,164.[16] The cost of these two contracts was $1,688,919, and work on the line had to be completed in fifteen months.[17] Construction on the line began in spring 1917, and a quarter of the work that needed to be done before the erection of the steel was completed by September 1917.[18] Work on the column footings for the elevated structure were completed by the end of the year.[19]
Construction on the line was 17% complete at the end of Fiscal Year 1917,[20] and was 25% complete at the end of Fiscal Year 1918. Drainage work on the line was 35% complete, and station work was underway at the end of Fiscal Year 1918.[21] In August 1919, work on the line was suspended because W.G. Cooper broke his contract due to the high cost of material and labor. In February 1920, a contract for the unfinished portion of the line was awarded to George W. McNulty and the Holbrook, Cabot and Rollins Company. The contract for the completion of stations was awarded in July 1920, and was expected to take six months to complete. That month, it was announced that the line would not be ready to open for an additional eight months.[22]
During 1919, the city purchased an area of land bounded by Hegeman and Lawrence Avenues, and Elton and Linwood Streets for the construction of a storage yard. Contracts for the yard were awarded in 1920.[23] The yard was to be built with inspection facilities and the ability to store 250 cars.[24]
Opening
The first portion of the line between Utica Avenue and Junius Street opened on November 22, 1920, with shuttle trains operating over this route.[25][26] This extended service on the Eastern Parkway Line, which had opened from Atlantic Avenue to Utica Avenue on August 23, 1920.[27] The New Lots Line opened one more stop farther to the east to Pennsylvania Avenue on December 24, 1920.[26] At that date, only the southbound platform was used.[2]: 129
In 1921, the stations at Van Siclen Avenue and New Lots Avenue were practically completed, but they were not opened yet because trains could not run to the terminal until track work, the signal tower, and the compressor room were in service.[28]: 129–130 On March 15, 1921, a contract for the completion of a signal tower to control train movements at the terminal crossovers at New Lots Avenue, and at the entrances to Livonia Yard, was submitted to the New York City Board of Estimate.[29][30] On May 26, 1921, the contract for the installation of tracks in Livonia Yard was awarded to B.T. & J.J. Mack, and was sent to the Board of Estimate for approval. However, the contract was returned to the New York State Transit Commission (NYSTC) on August 2, 1921, because the contract did not receive the number of votes needed for approval. The contract was returned to the Board of Estimate on April 5, 1922, and was approved on April 28, 1922.[24] The contract for the completion of the signal tower was rebid and was resubmitted to the Board of Estimate on May 15, 1922.[29][30] On May 18, 1922, work began on the installation of tracks in Livonia Yard,[24] and on June 9, 1922, the signal tower contract was approved.[29][30] On June 19, 1922, work began on the tracks, signal tower and compressor room.[31] The approach tracks needed for the operation of through service to New Lots Avenue were completed on July 18, 1922.[24]
Shuttles started operating between Pennsylvania Avenue and New Lots Avenue on October 16, 1922,[26] with a two-car train operating back and forth along on the northbound track.[31] Trains ran every eight minutes during rush hours, and ten minutes during middays, and made close connections with main line service at Pennsylvania Avenue.[32] The implementation of shuttle service was done at the request of the NYSTC,[33] which urged the IRT to start service as soon as it could safely be operated.[34] Though work on the tower was not yet finished at the time, enough was completed to allow for the shuttle service.[30] The use of shuttle service accelerated the opening of this portion of the line by a month,[34] when through service was estimated to be inaugurated with the completion of the tower.[32] Work on Livonia Yard was completed on December 31, 1922, and the yard was opened for service on July 28, 1923. On October 31, 1924, through service to New Lots Avenue was begun.[31]
Until January 23, 1928, it was custom to split full-length trains from Van Cortlandt Park (later labeled 1 trains) at Eastern Parkway–Brooklyn Museum on the IRT Eastern Parkway Line.[35] The back half of each train would travel to Flatbush Avenue–Brooklyn College on the IRT Nostrand Avenue Line, and the front half would travel to New Lots Avenue on the New Lots Avenue Line. This sometimes caused disputes when customers did not realize that the different portions of each train would go to different destinations.[36] With the change in service, West Farms trains (later labeled 2 trains) were extended from Atlantic Avenue to Flatbush Avenue, and all Van Cortlandt Park trains were extended to New Lots Avenue.[35] In July 1937, the line became fully signaled for the first time.[37]
Expansion plans
On March 1, 1951, the New York City Board of Transportation announced that it would conduct an engineering study for the construction of a third track between Utica Avenue and New Lots Avenue using the unused trackbed in the center of the elevated structure.[38]
In 1961, work to extend the platforms at stations along the line to accommodate ten-car trains was completed.[39] As part of an 18-month capital budget that took effect on January 1, 1963, the New Lots Avenue station was reconstructed.[40]
In 1968, as part of the proposed Program for Action, the IRT New Lots Line in East New York, would be extended southerly through the Livonia Yard to Flatlands Avenue to a modern terminal at Flatlands Avenue and Linwood Street. This two-track line would have run at ground level and it would have provided better access to the then-growing community of Spring Creek. This extension would have been completed at the cost of $12 million.[41] The extension was canceled in the mid-1970s, largely due to the city's fiscal crisis at the time.[42][43] As of 2022[update], a potential extension of the IRT New Lots Line through Livonia Yard is being evaluated as part of the 2025–2044 20-Year Needs Assessment.[44]
Service changes
2 and 3 trains kept on switching their southern terminals until July 10, 1983, when 2 trains began terminating at Flatbush Avenue and 3 trains began terminating at New Lots Avenue. In addition, rush hour 4 trains were rerouted from Flatbush Avenue to Utica Avenue, and late evening and late night service was rerouted from Flatbush Avenue to New Lots Avenue. 5 trains were rerouted from Utica Avenue to Flatbush Avenue during rush hours. These changes were made to reduce non-revenue subway car mileage, to provide a dedicated fleet for each service, and to provide an easily accessible inspection yard for each service. The change allowed the 2 to be dedicated to 239th Street Yard and allowed the 3 to be assigned to Livonia Yard. With the rerouting of 3 trains, train lengths along the New Lots Line were reduced from 10 cars to 9 cars, within acceptable crowding levels, and train lengths along the Nostrand Avenue Line were increased from 9 to 10 cars, reducing crowding.[45][46] 4 trains were added on December 20, 1946,[47] and 5 trains were gradually added between 1938 and 1950.
Station renovations
In 1975, the New York City Transit Authority (NYCTA) applied for a Mass Transportation Facilities Grant Application from the United States Department of Transportation (USDOT) to fund four improvement projects, including the replacement of wooden platforms with concrete platforms at Rockaway Avenue, Junius Street, Pennsylvania Avenue, and Van Siclen Avenue. This project was estimated to cost $1,451,000. The four projects part of this application, combined, were estimated to cost $13,801,000, with $9,661,000 to be funded by the grant, which the city requested to be reallocated from funding for urban highways. The remainder was to be funded from New York City and New York State.[48] The grant request was approved by the USDOT, and NYCTA invited contractors to bid on the platform replacement project in November 1976.[49]
From 2000 to August 2001, 3 train service was split into two sections to allow for the line to be rebuilt, with transfers available at Utica Avenue. Work took place on weekday middays between 10 a.m. and 3 p.m., and service operated in one of three ways: shuttle buses replaced trains, all trains operated in both directions on a single track, or shuttle trains ran. 4 trains terminated at Atlantic Avenue when shuttle or single-track trains were in operation.[50]
As part of the Metropolitan Transportation Authority (MTA)'s 2010–2014 Capital Program, funding was provided for a 25-station Station Renewal program, which focused on renovating stations with a high concentration of components rated 3.5 or worse on a five-point scale, with 5 being the highest. All of the stations on the line, except for New Lots Avenue, were among the priority candidates to be among the 25 stations selected for the program. Between 41% and 58% of components at these six stations were rated 3.5 or worse.[51] A $45.7 million contract was awarded to renovate the line's seven stations in 2014. The project was completed between January 2015 and October 2017. As part of the project, station drainage, doors, windows, railings, platform rubbing boards, structural steel, panels and signage were replaced. In addition, detectable warning strips, bird deterrent systems, track lubrication systems and artwork were installed. The project was completed in four phases, and each phase was supposed to take five months.[52] For the first phase, the Van Siclen Avenue and Rockaway Avenue stations were closed from April 20, 2015, to March 28, 2016.[53] Next, from April 11, 2016, until September 19, 2016, the Saratoga Avenue and Pennsylvania Avenue stations were closed for renovation.[54] The Pennsylvania Avenue station was closed once again from October 27, 2016, to March 3, 2017, due to a truck accident which damaged the station's mezzanine.[55] In the third phase, Junius Street and Sutter Avenue–Rutland Road stations were closed for renovations from October 5, 2016, to June 19, 2017.[54][56][57] In the fourth phase, which occurred simultaneously with the other phases, the New Lots Avenue station was renovated without being closed from December 2014 to December 2017.[58] The fare control area at New Lots Avenue was reconfigured.[59]
Funding for the construction of a free transfer between the Junius Street station and the nearby Livonia Avenue station on the BMT Canarsie Line, which is directly to the east of the station, was included in the 2015–2019 MTA Capital Program. Passengers can transfer between the two stations for free by using an overpass running parallel to the New Lots Line, which allows pedestrians on Livonia Avenue to cross over the Long Island Rail Road's open-cut Bay Ridge Branch, and using a MetroCard or OMNY. At the request of Brooklyn Borough PresidentEric Adams, and due to increasing ridership and plans for additional housing in the area, funding was provided to build the free transfer. In addition, both stations would also have been upgraded to become compliant with mobility accessibility guidelines under the Americans with Disabilities Act of 1990.[60] However, in the April 2018 revision to the Capital Program, funding for the project, with the exception of funding already used to design the connection, was removed.[61] A free MetroCard-only transfer between the two stations was provided during weekends and late nights as part of the reconstruction of the 14th Street Tunnel starting in April 2019.[62][63] Funding for the free transfer connection was added back in the 2020–2024 Capital Program.[64] In February 2020, the out-of-system transfer was made permanent until the in-system transfer was completed.[65]
Extent and service
The following services use part or all of the IRT New Lots Line:[66]
Time period
rush hours
middays, evenings, and weekends
late nights
limited service
no service
service
no service
limited service
no service
service
limited service
no service
The line is served by the 3 train at all times except late nights, when the 4 train takes over service. Some rush hour 2 and 5 trains also run on this line because of capacity issues at their usual terminal at Flatbush Avenue–Brooklyn College on the IRT Nostrand Avenue Line.[67]
Route description
The New Lots Line is the only elevated structure on the Brooklyn IRT. The line begins just east of Utica Avenue in Crown Heights, branching off from the IRT Eastern Parkway Line near Buffalo Avenue.[68][69][70] The line then emerges from a tunnel on the southeast corner along the eastern edge of Lincoln Terrace Park, the IRT New Lots Line then crosses a bridge over East New York Avenue and then runs over East 98th Street with only one station, until it approaches the intersection with Livonia Avenue, where the line curves over that avenue and continues as such until its terminus. Right after Junius Street station, Livonia Avenue is bisected by the Long Island Rail RoadBay Ridge Branch as well as the Linden Shops, both of which run between Junius Street and Van Sinderen Avenue, the latter of which is flanked by the BMT Canarsie Line, also an elevated line, but runs underneath the New Lots Line. The last station on the line is New Lots Avenue, which is actually two blocks west of its namesake street, where Livonia Avenue ends. The New Lots Line crosses over New Lots Avenue and then Elton Street, curving to the south and terminating within the Livonia Yard.[71][68][69][70] There is a provision for a future extension from New Lots Avenue in the elevated structure at Linwood Avenue.[26]
The line includes an unused trackway in the middle that was built as a provision for a third track.[72]: 2389 On the roof of the mezzanines at each station are cross ties but no rails. In some areas, the space is used for mechanical and signal rooms. A center track exists only at Junius Street, where it crosses the southbound track at grade towards the Linden Shops. This un-electrified track is one of only two connections to the national rail system. The BMT West End Line is the other connection, via the New York Connecting Railroad; the Linden Shops are connected to the Long Island Rail Road and from there to the rest of the national network.[71]
Station listing
Station service legend
Stops all times except late nights
Stops late nights only
Stops rush hours in the peak direction only
Stops rush hours in the reverse peak direction only
^ abc"IRT Brooklyn Line Opened 90 Years Ago". New York Division Bulletin. 53 (9). New York Division, Electric Railroaders' Association. September 2010. Retrieved August 31, 2016 – via Issu.
^ abIn a 1981 list of "most deteriorated subway stations", the MTA listed Borough Hall and Court Street stations as part of the New Lots Line: New York Times, Agency Lists Its 69 Most Deteriorated Subway Stations, June 11, 1981, section B, page 5
Note that this is a list of New York City Subway lines, which are the physical infrastructure over which services operate. Lines with colors next to them are trunk lines; trunk lines determine the color of New York City Subway service bullets, except for shuttles, which are dark gray.
Stations and line segments in italics are closed, demolished, or planned (temporary closures are marked with asterisks). Track connections to other lines' terminals are displayed in brackets. Struck through passenger track connections are closed or unused in regular service.
Untuk kegunaan lain, lihat Santana (disambiguasi). Kenneth SantanaLahirImmanuel Kenneth Santana4 September 1994 (umur 29)Serpong, Banten, IndonesiaAlmamaterUniversitas Bina NusantaraPekerjaanaktorpengusahaTahun aktif 2009—2014 2020—sekarang Suami/istriTeresa Rikiputri (m. 2023) Immanuel Kenneth Santana, S.E. (lahir 4 September 1994) merupakan aktor dan pengusaha berkebangsaan Indonesia.[1] Kehidupan pribadi Kenneth merupakan anak kedua dari...
Laodike VMata uang logam Demetrios I (kemungkinan) dengan Laodike VPermaisuri MakedoniaBerkuasa178/177 SM – 168 SMTakhta178 atau 177 SMPendahuluPolycratiaPenerusaneksasi oleh RomawiPermaisuri Kekaisaran SeleukiaBerkuasa161 BC–150 SM(belum dikonfirmasi)PendahuluLaodike IVPenerusApama atau Cleopatra TheaInformasi pribadiKelahiranSeleukiaKematian150 SMDinastiSeleukiaAyahSeleukos IVIbuLaodike IVPasangan Perseus Demetrios I (kemungkinan) Anak Dengan Perseus: Alexander Filipus Andriscus (d...
Liga 3 Sulawesi Selatan 2021Liga 3 Asprov PSSI Sulawesi SelatanLogo Liga 3 IndonesiaNegara IndonesiaTanggal penyelenggaraan13 November – 26 Desember 2021Tempat penyelenggaraan Lapangan M. Djunaid Hamzah, Kabupaten Sidenreng Rappang Lapangan Yonzipur 8/SMG Sakeang, Kabupaten Maros Stadion Bau Massepe, Kabupaten Pinrang Stadion FIK UNM, Kota Makassar Stadion Ganggawa, Kabupaten Sidenreng Rappang Stadion Gelora Bumi Massenrempulu Kukku, Kabupaten Enrekang Stadion Merdeka Kassi Kebo, Kabupaten ...
نافين أندروز معلومات شخصية اسم الولادة نافين وليام سيدني أندروز الميلاد 17 يناير 1969 (العمر 55 سنة)لندن، إنجلترا مواطنة المملكة المتحدة الطول 1.73 سم العشير باربرا هيرشي (1998–2005) الحياة العملية الأدوار المهمة سعيد جراح في لوست المدرسة الأم مدرسة جيلدهولمدرسة إيمانويل ...
Untuk novel Prancis, lihat La Symphonie Pastorale. La Symphonie pastoralePoster filmSutradaraJean DelannoyDitulis olehJean AurencheAndré Gide (novel)PemeranPierre BlancharMichèle MorganDistributorPathé Consortium CinémaTanggal rilis September 1946 (1946-09) (Festival Film Cannes) Durasi110 menitNegaraPrancisBahasaPrancis La Symphonie pastorale adalah film drama berbahasa Prancis tahun 1946 yang disutradarai Jean Delannoy dan dibintangi Michèle Morgan dan Pierre Blanchar. Film in...
Hanunó'oᜱᜨᜳᜨᜳᜢJenis aksara Abugida BahasaHanunó'oPeriodesekitar abad ke-14 sampai sekarangArah penulisanKiri ke kananAksara terkaitSilsilahMenurut hipotesis hubungan antara abjad Aramea dengan Brahmi, maka silsilahnya sebagai berikut: Abjad Proto-Sinai Abjad Fenisia Abjad Aramea Aksara Brahmi Dari aksara Brahmi diturunkanlah:Aksara PallawaAksara KawiHanunó'oAksara kerabatBaliBatakBaybayinBugisIncungJawaLampungMakassarRejangSundaISO 15924ISO 15924Hano, 371 , Ha...
Voce principale: Forlì Football Club. Associazione Calcio ForlìStagione 1968-1969Sport calcio Squadra Forlì Allenatore Attilio Santarelli poi Rino Montanari Presidente Giacomo Filippi (Commissario straordinario) Serie C20º posto nel girone B. Retrocesso in Serie D. Maggiori presenzeCampionato: Giacinti (38) Miglior marcatoreCampionato: Bardi (5) StadioStadio Tullo Morgagni 1964-1965 1977-1978 Si invita a seguire il modello di voce Questa voce raccoglie le informazioni riguardanti l'...
Australian judge (1916–2000) Ted LusherBorn(1916-06-16)16 June 1916SydneyDied5 January 2000(2000-01-05) (aged 83)SydneyNationalityAustralianEducationNewington CollegeSydney Grammar SchoolUniversity of SydneyOccupation(s)Solicitor, barrister, queen's counsel, judgeTitleThe Honourable Edwin Lusher QCSpouseGloriaChildren5 children including Stephen Lusher The Honourable Edwin Augustus Lusher QC (16 June 1916 – 5 January 2000) was an Australian judge who chaired New South Wales commissio...
烏克蘭總理Прем'єр-міністр України烏克蘭國徽現任杰尼斯·什米加尔自2020年3月4日任命者烏克蘭總統任期總統任命首任維托爾德·福金设立1991年11月后继职位無网站www.kmu.gov.ua/control/en/(英文) 乌克兰 乌克兰政府与政治系列条目 宪法 政府 总统 弗拉基米尔·泽连斯基 總統辦公室 国家安全与国防事务委员会 总统代表(英语:Representatives of the President of Ukraine) 总...
Bernard PunslyPunsly dalam trailer untuk Little Tough Guy (1938)Lahir(1923-07-11)11 Juli 1923New York, New York, Amerika SerikatMeninggal20 Januari 2004(2004-01-20) (umur 80)Torrance, CaliforniaPekerjaanPemeranTahun aktif1937–1943 Bernard Punsly (11 Juli 1923 – 20 Januari 2004) adalah seorang pemeran Amerika Serikat[1] yang kemudian meninggalkan industri hiburan untuk menjadi dokter. Nama terakhirnya sering kali secara keliru disebut dalam film sebagai Pun...
Noralpha Nord 1101 Noralpha, in French Air Force markings, taking off from Coventry Airport, England, in 2000 Role Communications and liaison monoplaneType of aircraft Manufacturer Nord Aviation First flight 1944 Number built 200 Developed from Messerschmitt Bf 108 The Nord 1100 Noralpha was a French-built and re-engined Messerschmitt Bf 108 produced by Nord Aviation. Development Construction of the Messerschmitt Bf 108 was transferred to the Société Nationale de Constructions Aéronautiqu...
Ice hockey team in Küsnacht, SwitzerlandGCK LionsCityKüsnacht, SwitzerlandLeagueSwiss LeagueFounded1932Home arenaKEK Küsnacht(capacity 1,520)Colors General managerManfred FrischknechtHead coachMichael LinigerCaptainMarc GeigerAffiliateZSC LionsWebsitegck.zsclions.chFranchise history1932–2000Grasshopper Club Zürich2000–presentGCK Lions Current season Grasshopper Club Küsnacht Lions known as GCK Lions is a Swiss professional ice hockey team founded in 1932.[1] ...
U.S. National Restaurant Association's food and beverage safety training program This article relies excessively on references to primary sources. Please improve this article by adding secondary or tertiary sources. Find sources: ServSafe – news · newspapers · books · scholar · JSTOR (July 2019) (Learn how and when to remove this message) ServSafe is a food and beverage safety training and certificate program administered by the US National Restaurant ...
Privately owned park in Manhattan, New York United States historic placeGreenacre ParkU.S. National Register of Historic Places (2018)Show map of ManhattanShow map of New York CityShow map of New YorkShow map of the United StatesLocation217 E. 51st St., New York, New YorkCoordinates40°45′22″N 73°58′09″W / 40.756206°N 73.969248°W / 40.756206; -73.969248Built1971[1]NRHP reference No.100002076Added to NRHPFebruary 2, 2018[2] Greenacre...
American politician (1804–1878) This article includes a list of references, related reading, or external links, but its sources remain unclear because it lacks inline citations. Please help improve this article by introducing more precise citations. (March 2016) (Learn how and when to remove this message) Charles ConradMember of the C.S. House of Representativesfrom Louisiana's 2nd districtIn officeFebruary 18, 1862 – March 18, 1865Preceded byConstituency establishedSucceeded byC...
Australian actor and producer (born 1969) Cate Upton redirects here. Not to be confused with Kate Upton. Cate BlanchettACBlanchett in 2023BornCatherine Elise Blanchett (1969-05-14) 14 May 1969 (age 55)Melbourne, Victoria, AustraliaCitizenshipAustraliaUnited States[1]EducationNational Institute of Dramatic Art (BFA)OccupationsActorproducerYears active1990–presentWorksFull listBoard member ofSydney Theatre CompanySpouse Andrew Upton (m. 1997)R...
2012 United States House of Representatives elections in Georgia ← 2010 November 6, 2012 (2012-11-06) 2014 → All 14 Georgia seats to the United States House of Representatives Majority party Minority party Party Republican Democratic Last election 8 5 Seats won 9 5 Seat change 1 Popular vote 2,104,098 1,448,869 Percentage 59.21% 40.77% Swing 2.69% 2.68% Republican 60–70% 70–80% 90&g...