IRS-P2 carried an instrument, the Linear Imaging Self-Scanning Sensor-2M (LISS-2M),[2] two solid state push broom cameras operating using Charge-coupled device (CCD) and were capable of providing imagery in four spectral bands in the visible and near-infrared range with 32 m (105 ft) resolution.[8][9]
Mission
IRS-P2 completed its mission successfully on 15 September 1997 after a duration of 3 years.[10]
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ). Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses).