You can help expand this article with text translated from the corresponding article in Hebrew. (February 2024) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Hebrew Wikipedia article at [[:he:כביש 79]]; see its history for attribution.
You may also add the template {{Translated|he|כביש 79}} to the talk page.
On January 19, 2009, a tender was published to widen 8.5 km of the highway next to HaMovil Junction to 2 lanes per direction, including the construction of several interchanges, at the cost of NIS 500 million.[1]
In the future, a tram-train connecting Haifa and Nazareth is planned to be built in the highway's median along most of the highway's route.
Junctions & Interchanges (east to west)
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. Please consult this guideline for information on how to create one. Please improve this article if you can.(November 2021)