You can help expand this article with text translated from the corresponding article in Finnish. (February 2020) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Finnish Wikipedia article at [[:fi:Pisararata]]; see its history for attribution.
You may also add the template {{Translated|fi|Pisararata}} to the talk page.
The target is to free up capacity at Helsinki Central railway station to allow for expansion of long-distance trains; the existing capacity between Pasila and Helsinki has been all used up with the opening of the Ring Rail Line in 2014.[3] Detailed planning took place during 2012–2015, resulting in the project being shelved in February 2015.[4] The project was initially expected to cost €956 million if completed by the 2020s.[5] For the planning stages, €40 million was allocated.[6] By 2019 the expected cost of the original plan had risen to €1.5 billion.[7]
In June 2022, the Finnish Transport Infrastructure Agency (FTIA) published a report stating that the City Rail Loop is not necessary, and suggested alternatives such as renewal of commuter train fleets and improved railway signalling. Individual changes in gear and geometry are also needed in the railway area of the Central railway station and Pasila.[8] However, the study has looked at a situation in which the City Rail Loop, Lentorata, the new direct line between Riihimäki and Tampere and the Helsinki–Turku high-speed railway would have been implemented.[9]