Guernsey Electricity

Guernsey Electricity Limited
IndustryElectricity utility
Founded1907
Headquarters,
Bailiwick of Guernsey, Channel Islands
Key people
Alan Bates, Chief Executive
Websitewww.electricity.gg

Guernsey Electricity Limited (GE) is the sole commercial electricity supplier on the island of Guernsey. GE has been operating for over 100 years, moving from local generation of power from coal, and later oil, to investing in cables to connect into the grids in Jersey and France through the Channel Islands Electricity Grid.

Business model

The cable connection to France provides most of the electric energy sold in Guernsey, but the power station still needs to maintain sufficient capacity to generate power should the cable fail. There are eight oil-fired diesel engines and three oil-fired gas turbines. These include two new diesel engines, given the names "Trudy"and "Freddy", costing £15m each, which were installed in engine room "D" in March 2017.[1]

Environmental and cost considerations require the maximum use of the cable link, which is limited to 60MW.

  • Minimum demand is around 23 MW, with peak demand in 2022 of 95 MW.
  • Revenue from electricity sales in 2022 was £54.7m.
  • 29,763 customers in 2022
  • 340,726 MWh imported 2022
  • 30,006 MWh generated in 2022
  • 357,311 MWh distributed 2022
  • Power outages were an average of 23 minutes in 2022
  • In 2022 92% of electricity was imported using the cable link.[2]

A retail shop is attached to the power station at North Side, Vale.

GE is governed by the Electricity (Guernsey) Law, 2001 (as amended) and is regulated by the Channel Islands Competition and Regulatory Authorities.[3]

Undersea cables

In the mid-1970s investigations were undertaken to determine the practicality of an undersea cable. Jersey connected to France in 1984 (EDF1). No further decision was taken until 1996 when it was agreed to connect Guernsey to Jersey (GJ1) and lay a second 90 MW cable (Normandie 2) from France to Jersey, the work being completed in 2000 at a cost of £50m. The cables contain a 24 fibre optic communications cable.[4]: 134–5 

A second 100 MW DC cable (GJ2) was planned to be installed,[5] but was suspended after the existing GJ1 failed. GJ1 was replaced in 2019.[6]

GE has invested heavily in the Channel Islands Electricity Grid, using debt to finance the investment,[7] but losses in 2019 and 2020 as a result of the failure of the GJ1 cable requiring oil to be burnt for fuel, and the cost of the replacement GJ1, damaged finances.

The possibility of a 54 km (34 mi) direct cable to France designated GF1 was discussed in 2021.[8]

Future plans

In 2023 a plan for the next 25 years recommended:[9]

  • A new 100 MW cable (GF1) connecting Guernsey to France
  • Solar panels to provide around 8-10% of Guernsey's needs
  • Offshore wind farm to supply 46-55% of electricity needs

The plan received political approval in September 2023.[10]

Estimated costs are:[11]

  • 2024-25 £63m for upgrading the thermal plant (current power station) and £10m for solar
  • 2026-30 £96m for GF1 interconnector and £6m for solar
  • 2031-35 £203m for offshore wind and £6m for solar
  • 2036-40 £28m for hydrogen fuel cell, £63m for existing thermal plant and £6m for solar
  • 2041-45 £6m for hydrogen fuel cell, £59m for existing thermal plant and £8m for solar
  • 2046-50 £14m for thermal plant and £6m for solar

The price paid by consumers is expected to rise until 2030, then gradually fall.[11]

History

Early electricity uses in Guernsey

In 1887 a dynamo was used to generate electricity for street lighting in front of Randalls Brewery in the Avenue, followed in 1897 by a water-powered first domestic installation at Le Chalet, Fermain Bay.[4]: 5 

In 1898 Edmundsons Electricity Corporation was granted the concession to build and operate an electricity supply in Guernsey. 7 kilometres (4.3 mi) of cables would have to be installed below ground within two years. In February 1900 150 kW could be generated from the power station at Les Amballes, St Peter Port.[4]: 6–7 

Prepayment meters had to be provided that would take English or French coins. Three currencies were in circulation in Guernsey at that time. £1 Guernsey was equivalent to 19s British, and 10d Guernsey was worth 1 French franc.[4]: 9  Units being sold at 7d for the first unit per day and 4d thereafter.

The quarry industry needed electricity for cranes, and in 1902 it was decided to build a second power station at St Sampson's; this took the generating capacity to 870 kW, with units supplied rising from 65,000 to 1.75m a year in 1910. A 2,500 volt DC cable connected the two generating centres. A battery storage system was used to provide a 24-hour service. This meant the generators only needed to operate four days a week.[4]: 14–6  With 1,000 consumers by 1910, the price per unit fell to an average of 212d.

Guernsey Electric Light and Power Company Limited

In 1907 a company was formed, Guernsey Electric Light and Power Company Limited to run the Edmunsons business in Guernsey. Between 1908 and 1911 diesel generators were installed at both power stations, increasing capacity to 1,340 kW. An explosion in November 1918 at the Vale power station left the road covered in debris.[4]: 19–27  The increased price of coal and oil during World War I and the requirement to expand the network resulted in a new law which increased tariffs and allowed overhead lines to be installed in country areas.

  • Connections created to charge electric vehicles – 1914
  • Wind turbine built – 1925 [4]: 34 

In 1933 the States of Guernsey cancelled the concession and acquired the business at a cost of £285,500 at which time the capacity was 3.73 MW with 2,928 consumers on 165 kilometres (103 mi) of cables with eight substations. It would be supervised by the States Electricity Board.[4]: 48 

1934 saw the start of a 50 Hz 230 V AC supply, however some existing consumers took decades to change from DC. In 1938 the last coal-fired generator was retired as new fuel tanks were built to store oil. By 1939 an additional 110 km of mains cables were installed with 17 additional substations built and 6.9m units were sold a year to 5,774 consumers.[4]: 52–5 

Occupation

In June 1940 two thirds of the employees were evacuated to England, leaving 36 volunteer employees to suffer the German occupation. Restrictions were placed on electricity usage, sufficient oil was available to provide reduced power until May 1941. The generation of power from burning waste was tested, with coal burning as a backup system, it helped meet the minimum essential load requirement of 145 kW. Supply fell to 3.4m kW,[clarification needed] the main user of power was the German occupiers with most of their power being paid for by the States of Guernsey. Limited supplies of oil arrived on the island and generators were changed to run off town gas. The Organisation Todt (OT) who were constructing defences in the island were required to arrange for the delivery of oil to generate the electricity they needed.[4]: 59–67 

The winter of 1942-3 showed excessive unit usage, which could be demonstrated that 75% of usage was to German-occupied premises with a number of illegal connections. Further restrictions were imposed in October 1943 allowing four units of power per week per house. The OT built a power station to run off anthracite and coal in the Petit Bouet with a 720 kW capacity and using sea water for cooling.[4]: 65–70 

By January 1945 electric power was barely available to process milk or purify and pump water. Coal brought in by the Red Cross of the SS Vega in April allowed coke to be produced from which electricity could be generated for civilian use. Guernsey was liberated on 9 May 1945.

Post War

The immediate aftermath of the war saw repairs necessary in many areas however replacement machinery was hard to obtain.

During the 1950s demand increased rapidly with sales reaching 32.5m units and consumers rising to 14,805. An AC ring main was constructed around the island. Eight new generators were acquired giving a capacity of 12.5MW.[4]: 83  DC was replaced with AC when opportunities arose however there were still over 600 DC customers in 1966.

A new generating hall ‘B’ was built. as demand continued to rise and more generators were acquired, including a Stal Laval GT35 gas turbine, taking the total to 24, including 12 Mirrlees KVSS12 and 6 Mirrlees Major's, providing 54.6MW. By 1970 consumers reached 21,507 with 130.7m units sold. ‘C’ engine hall was constructed in 1979 to house new Sulzer 9RNF68 generators and ‘A’ hall decommissioned.

The 1980s saw capacity increase to 72MW in 1984 which was adequate for the maximum demand of 43MW, however demand was still increasing reaching 64.5MW on 8 January 1997,[4]: 129  a new Sulzer 9RTA58 generator was housed in the new ‘D’ generating hall and two new Thomassen gas turbines were acquired. The last DC customer was Randalls Brewery which converted their bottling plant to AC in 1987.[4]: 127 

In 1998 GE was commercialised as a trading company with assets of £91.5m. Thermal efficiency of generating plant had risen to 43%, system load factor had reached 58% and distribution system losses reduced to 9.5%.[4]: 141 

See also

References

  1. ^ "Engines named Trudy & Freddy". Island FM. 20 March 2017. Archived from the original on 21 March 2017. Retrieved 20 March 2017.
  2. ^ "Annual report and financial statements 30 September 2022". 30 September 2022.
  3. ^ "Channel Islands Competition and Regulatory Authorities". CICRA. Archived from the original on 2016-12-23. Retrieved 2016-12-20.
  4. ^ a b c d e f g h i j k l m n o Towner, Eric. From Muscle-power to Megawatts. Guernsey Electricity.
  5. ^ "Guernsey-Jersey 2 (GJ2) Interconnector". 4COffshore.
  6. ^ "Guernsey's supply of green electricity". Retrieved 22 May 2023.
  7. ^ "Guernsey Electricity - Off-Island Electricity Cable Connectivity - Statement by the Minister of Treasury and Resources". Gov.gg. 20 May 2013.
  8. ^ "Talks under way on direct cable link with France". 6 May 2021.
  9. ^ "Electricity Strategy proposes strategic direction for Guernsey's future electricity supply". 6 June 2023.
  10. ^ "OPINION: What happened in the States last week?". 16 September 2023.
  11. ^ a b "Electricity Strategy". Retrieved 20 September 2023.

Read other articles:

Artikel ini tidak memiliki referensi atau sumber tepercaya sehingga isinya tidak bisa dipastikan. Tolong bantu perbaiki artikel ini dengan menambahkan referensi yang layak. Tulisan tanpa sumber dapat dipertanyakan dan dihapus sewaktu-waktu.Cari sumber: Puti – berita · surat kabar · buku · cendekiawan · JSTOR Puti adalah nama kecil atau gelar yang diberikan kepada perempuan yang masih berdarah bangsawan Minangkabau baik darah raja maupun darah datuk yan...

 

Charles Rigault de GenouillyCharles Rigault de GenouillyLahir1807Rochefort, PrancisMeninggal1873Barcelona, SpanyolPengabdian PrancisDinas/cabang Angkatan Laut PrancisPangkatLaksamana PrancisPerang/pertempuranPemboman TouranePerang KrimeaPerang Candu KeduaKampanye Cochinchina Laksamana Pierre-Louis-Charles Rigault de Genouilly (12 April 1807 – 4 Mei 1873) merupakan seorang perwira angkatan laut Prancis. Dia berperang dengan istimewa dalam Perang Krimea dan Perang Candu Kedua, tetap...

 

Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada Desember 2022. Ágnes EsterházyLahirÁgnes Jósika de Branyitska(1891-01-15)15 Januari 1891Kolozsvár, Austria-Hungaria (kini Cluj-Napoca, Rumania)Meninggal4 April 1956 (usia 65)Munich, Jerman BaratNama lainGräfin Agnes EsterhazyAgnes von EsterhazyPekerjaanPe...

Untuk kegunaan lain, lihat Sakti (disambiguasi). Saktienergi surgawiAdi Parashakti Lalita Tripura Sundari duduk di atas Brahma, Wisnu, Rudra, Syiwa and ParasiwaNama lainAdi Parashakti, Dewi, Durga, Mahalakshmi, Parwati, Saraswati, Kali, SatiAfiliasiDewiSenjataSemua Artikel ini adalah bagian dari seriSakta Ketuhanan tertinggi Adi Parasakti (Mahadewi) Perwujudan Mahadewi Lalita Tripura Sundari Tridewi Saraswati Laksmi Durga Navadurga Mahawidya Kali Sati Parwati Bhairawi Kamakhya (Kubjika) Yogin...

 

العلاقات السنغالية المالاوية السنغال مالاوي   السنغال   مالاوي تعديل مصدري - تعديل   العلاقات السنغالية المالاوية هي العلاقات الثنائية التي تجمع بين السنغال ومالاوي.[1][2][3][4][5] مقارنة بين البلدين هذه مقارنة عامة ومرجعية للدولتين: وجه المقا...

 

Ruggero I di Pugliadetto Ruggero BorsaMoneta di Ruggero BorsaDuca di Puglia e CalabriaStemma In caricasettembre 1085 –22 febbraio 1111 PredecessoreRoberto il Guiscardo SuccessoreGuglielmo II di Puglia Nascita1060 circa MorteSalerno, 22 febbraio 1111 SepolturaSalerno Luogo di sepolturaCattedrale di Salerno DinastiaAltavilla PadreRoberto il Guiscardo MadreSichelgaita di Salerno ConsorteAdelaide di Fiandra FigliLudovico, Guglielmo, Guiscardo, Guglielmo (figlio illegittimo avuto da u...

Constantine's vision and the Battle of the Milvian Bridge in a 9th-century Byzantine manuscript. During the reign of the Roman Emperor Constantine the Great (306–337 AD), Christianity began to transition to the dominant religion of the Roman Empire. Historians remain uncertain about Constantine's reasons for favoring Christianity, and theologians and historians have often argued about which form of early Christianity he subscribed to. There is no consensus among scholars as to whether he a...

 

LudacrisChristopher Bridges menghadiri premiere film Max Payne di Hollywood, California pada 13 Oktober 2008Informasi latar belakangNama lahirChristopher Brian Bridges[1]LahirChampaign, IllinoisAsalAtlanta, Georgia, USAGenreHip hopPekerjaanrapper, AktorInstrumenRapping, VocalsTahun aktif1998–sekarangLabelDTP, Def JamSitus webludacris.defjam.com Christopher Brian Bridges (lahir 11 September 1977) atau lebih dikenal dengan Ludacris merupakan seorang aktor dan penyanyi rap berkebangsaa...

 

Pour une institution plus récente, voir Sénat de la République (Italie). Politique dans la Rome antique Données clés Royauté romaine753 – 509 av. J.-C. République romaine509 – 27 av. J.-C. Empire romain27 av. J.-C. – 476 Principat27 av. J.-C. – 285 Dominat285 – 476 Emp. d'Occident395 – 476 Emp. byzantin395 – 1453 MagistraturesCursus honorum Magistrats ordinaires Tribun de la plèbe QuesteurÉdilePréteur Tr. consulaireConsulCenseur Promagistrats Propréteur Pro...

Questa voce sull'argomento ciclisti britannici è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Steven Burke Nazionalità  Regno Unito Altezza 183 cm Peso 78 kg Ciclismo Specialità Pista Termine carriera 2019 CarrieraSquadre di club 2010Motorpoint2012IG-Sigma Sport2015-2017Team WigginsNazionale 2009-2019 Regno UnitoPalmarès Competizione Ori Argenti Bronzi Giochi olimpici 2 0 1 Campionati del mondo 1 4 1 Campionati europei 4 2 0 Vedi maggiori det...

 

Pub in the City of London The Centre Page, London EC4 The Centre Page is a pub at 29–33 Knightrider Street, London EC4. It is a Grade II listed building, built in the mid-19th century, and previously known as The Horn Tavern.[1] References ^ Historic England. Horn Tavern (1064623). National Heritage List for England. Retrieved 20 November 2016. External links Official website Media related to The Centre Page at Wikimedia Commons 51°30′45″N 0°05′55″W / 51.51...

 

2020年夏季奥林匹克运动会波兰代表團波兰国旗IOC編碼POLNOC波蘭奧林匹克委員會網站olimpijski.pl(英文)(波兰文)2020年夏季奥林匹克运动会(東京)2021年7月23日至8月8日(受2019冠状病毒病疫情影响推迟,但仍保留原定名称)運動員206參賽項目24个大项旗手开幕式:帕维尔·科热尼奥夫斯基(游泳)和马娅·沃什乔夫斯卡(自行车)[1]闭幕式:卡罗利娜·纳亚(皮划艇)&#...

Myths and legends of English culture This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: English folklore – news · newspapers · books · scholar · JSTOR (Januar...

 

Demographics of North KoreaNorth Korea population pyramid in 2020Population25.97 million (2021)Density199.54 inhabitants / sq. km. (2008)Growth rate0.84% (1993–2008)Birth rate14.35 births/1,000 population (2021 est.)Death rate9.39 deaths/1,000 population (2021 est.)Life expectancy71.65 years (2021 est.) • male67.79 years (2021 est.) • female75.74 years (2021 est.)Fertility rate1.91 children born/woman (2021 est.)Infant mortality rate22.42 deaths/1,000 live birt...

 

24.ª DivisiónActiva 3 de abril de 1937-17 de enero de 1939País EspañaFidelidad República EspañolaRama/s Ejército Popular RegularTipo InfanteríaTamaño DivisiónAlto mandoComandantesnotables Miguel Gallo MartínezMiguel García VivancosGuerras y batallas Guerra Civil Española[editar datos en Wikidata] La 24.ª División fue una de las divisiones del Ejército Popular de la República que se organizaron durante la Guerra Civil española sobre la base de las brigadas mixtas. A...

Wakil Bupati TabananSadhu mawang anuraga(Bali) Setia dan bijaksana menjalankan dharma demi kecintaan pada rakyatPetahanaI Made Edi Wirawan, S.E.sejak 26 Februari 2021Masa jabatan5 tahunDibentuk2000Pejabat pertamaI Gusti Gede Putra WirasanaSitus webwww.tabanankab.go.id Berikut ini adalah daftar Wakil Bupati Tabanan dari masa ke masa. No Wakil Bupati Mulai Jabatan Akhir Jabatan Prd. Ket. Bupati 1 I Gusti Gede Putra Wirasana 2000 2005 1   I Nyoman Adi Wiryatama 2005 2010 2   2 I K...

 

NMB48 NMB48のロゴマーク(文字版)基本情報出身地 日本ジャンル J-POP活動期間 2010年 -レーベル laugh out loud! records(2011年7月 - 2022年11月)ユニバーサルシグマ(2022年11月 - )事務所 KYORAKU吉本.ホールディングス[注釈 1](2010年 - 2016年12月、2019年6月 - )Showtitle(2016年12月 - )共同作業者 秋元康剱持嘉一AKB48グループ公式サイト NMB48公式サイトメンバー メンバーを参照旧�...

 

American politician (born 1980) Jared MoskowitzMember of the U.S. House of Representativesfrom Florida's 23rd districtIncumbentAssumed office January 3, 2023Preceded byTed DeutchMember of theBroward County Commissionfrom the 8th districtIn officeJanuary 12, 2022 – January 3, 2023Appointed byRon DeSantisPreceded byBarbara ShariefSucceeded byRobert McKinzieDirector of the Florida Division of Emergency ManagementIn officeJanuary 15, 2019 – April 30, 2021Gove...

  لمعانٍ أخرى، طالع المركبة (توضيح). صورة لنقش ماتانوس مريان عن رؤية حزقيال (1670) جزء من سلسلة مقالات حولقبالة مفاهيم عين صوف الخفض النور اللاشيء السفيروت العوالم الأربعة التسلسل شجرة الحياة المركبة الملائكة في اليهودية حضرة الله مظهر الله تقشرات عالم اللانظام والتقوي�...

 

Albrecht Weber, 1899 Albrecht Friedrich Weber (pelafalan dalam bahasa Jerman: [ˈalbʁɛçt ˈveːbɐ];[1][2] 17 Februari 1825 – 30 November 1901) adalah seorang Indologis dan sejarawan Jerman.[3] Ia lahir di Breslau, dimana ayahnya menjadi profesor ekonomi politik. Ia belajar di kota tersebut, Bonn, dan Berlin, pada 1842-1845, menyibukkan dirinya sendiri dengan sastra dan filologi Sanskerta. Ia meraih gelar doktor di Breslau. Pada 1846, ia meng...