Greater Nashik metro or Metro NEO route diagram[3]
Project details (DPR)
Budget
The Maharashtra government has invested 2,100.6 crore for the "Metro Neo" project.[4]
1st line
The first line is proposed from Shramik nagar (Satpur) in west to Nasik Road railway station in east.
There will be 17 stations on this route. The route will be of 22.5 km.
2nd line
This route is proposed to be built from Gangapur Road to Mumbai Naka.
There will be 10 stations on this route which will be 10.5 km long.
Depots
A tram (rubber tyred metro) depot will be constructed at Shramik nagar.
Interchange station
Interchange station will be constructed at CBS and Gangapur Road[5]