The Gary Works is a major steel mill in Gary, Indiana, on the shore of Lake Michigan. For many years, the Gary Works was the world's largest steel mill, and it remains the largest integrated mill in North America.[1] It is operated by U.S. Steel.
The Gary Works includes both steelmaking and finishing facilities as an integrated mill, and has an annual capacity of 8.2 million tons.[2] It contains:[3]
An 80" one-stand, a 48" two-stand, and an 84" two-stand temper mills
A 48" two-stand double cold-reduction mill
A 37" and a 46" electrolytic tinning lines
Pig Iron Caster
The Gary Works was under construction from 1906 to 1908, and the first shipment of iron ore was unloaded on June 23, 1908.[4] About 11 million cubic feet (310,000 m3) of sand were moved in the process of constructing the plant.[5]
The Gary Works remains Gary's largest single employer and a key element of the city's tax base,[6] but employment levels have fallen substantially since the mid-20th century; the plant and allied facilities employed over 30,000 people in the early 1970s, but only 6,000 in 1990,[7] 5,000 in 2015,[8] 2,500 in 2021,[9] and 2,246 in 2023.[10] The plant is also a central part of the city's geography; its main entrance is at the northern end of Broadway, the city's main thoroughfare.