|
History |
Italy |
Name | GO 59 |
Builder | Cantiere Navale Giacalone di Mazara del Vallo (Trapani) |
Cost | €7 million[1] |
Laid down | 2013 |
Launched | 2014 |
Acquired | 2011 |
Commissioned | march 2014 |
In service | 1 |
Homeport | Brindisi[2] |
General characteristics |
Type | Floating dry dock |
Length |
- - 70.00 m (229 ft 8 in) LOA[3]
- - working length = 60.00 m (196 ft 10 in)
|
Beam |
- - 19.0 m (62 ft 4 in)
- - working beam = 14.0 m (45 ft 11 in)
|
Draught | 8.0 m (26 ft 3 in) (max)Error: has synonymous parameter (help) |
Draft | 9.5 m (31 ft 2 in) (max)Error: has synonymous parameter (help) |
Propulsion | |
Notes | lifting capability 1.000 t (0.984 long tons) |
GO 59 is a Floating dry dock of the Marina Militare.[4]
History
Delivered to Arsenale Militare Marittimo di Augusta on 26 March 2014,[5][6] it was transferred to Stazione Navale di Brindisi on 24 February 2016.[7]
These are the technical specifications of MM for its realization.
References
External links
- Ships Marina Militare website