In October 2023 the school moved to a new campus in the Tempo Road area. It was originally planned for construction in 2007.[1] Construction began in 2019. After construction began, the build was later delayed several times due to the COVID-19 pandemic,[2] originally to be completed by November 2021.[3] It cost £25.6m.[4]