You can help expand this article with text translated from the corresponding article in Czech. (July 2023) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Czech Wikipedia article at [[:cs:Dálnice D49]]; see its history for attribution.
You may also add the template {{Translated|cs|Dálnice D49}} to the talk page.
D49 motorway (Czech: Dálnice D49), formerly Expressway R49 (Czech: Rychlostní silnice R49) is an expressway under construction in the Czech Republic. When completed, it will connect D1 highway to the Slovakia's D1 highway via the R6 expressway. It is supposed to replace the planned route of the D1 highway to Slovakia, which original direction to Púchov (Slovakia) was diverted and now leads to Ostrava.
Construction began in 2008, but was suspended in 2010 at first due to a lack of funding, but ultimately due to objections and lawsuits from environmental activists. In the fall of 2019, ŘSD planned to resume construction of the Hulín to Fryšták section in 2020, with commissioning planned for 2024; other sections would follow later. Construction of the first section resumed at the end of 2021.
In the fall of 2023, the planned section from Vizovice to the Slovak border was redesignated as first class road I/49.