Construction of the dam began in 1976. The dam was completed in 1985. It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE).[1]
Dam
Crestuma–Lever Dam is a 25.5[2][3][4] m tall (height above foundation) and 470 m long gravity dam with a crest altitude of 25.5 m. The volume of the dam is 205,000 m³. The spillway with 8 gates is part of the dam body (maximum discharge 26,000 m³/s).[1]
Reservoir
At full reservoir level of 13 m (maximum flood level of 21.5 m) the reservoir of the dam has a surface area of 12.98 km2 and a total capacity of 110 mio. m³.[1] The active capacity is 22.5[1][2] (16[4] or 19[5]) mio. m³.
The power station contains 3 Kaplan turbine-generators (horizontal axis) with 39 (36[6]) MW (36.1 MVA) each in a dam powerhouse located on the left side of the dam. The turbine rotation is 83.3 rpm. The minimum hydraulic head is 6.8 m, the maximum 12.6 m. Maximum flow per turbine is 450 m³/s.[2]
The turbines and generators were provided by Sorefame.[6]
Lock
On the left side of the dam is a lock, which can handle ships with the following maximum properties: 83 m in length, 11.40 m on the beam, 3.8 m load-draught and a cargo capacity of 2500 tons.[7]