The new footbridge was proposed by Manchester-based architects Hodder + Partners, whose entry won the design competition in 1997.[1] Construction swiftly began and was soon complete in time for opening in 1999.
The structure has won numerous awards and the new footbridge has symbolised the renaissance of Manchester city centre since the bomb.[2] The bridge was one of the earliest structures to be built after the bomb and overhangs the spot where the bomb exploded.
In 2011, the bridge received a seven-month renovation at a cost of £730,000.[3] Repairs included fixing cracked window panes and permanently replacing floor panels.[4]