The Combined Charging System (CCS) is a standard for chargingelectric vehicles. It can use Combo 1 (CCS1) or Combo 2 (CCS2) connectors to provide power at up to 500 kilowatts (kW) (max. 1000 V and 500 A).[1] These two connectors are extensions of the IEC 62196Type 1 and Type 2 connectors, with two additional direct current (DC) contacts to allow high-power DC fast charging. In response to demand for faster charging, 400 kW CCS chargers have been deployed by charging networks and 700 kW CCS chargers have been demonstrated.
The Combined Charging System allows AC charging using the Type 1 and Type 2 connector depending on the geographical region. This charging environment encompasses charging couplers, charging communication, charging stations, the electric vehicle and various functions for the charging process such as load balancing and charge authorization.
Electric vehicles or electric vehicle supply equipment (EVSE) are CCS-capable if they support either AC or DC charging according to the standards listed by the CCS. Automobile manufacturers that support CCS include BMW, Daimler, FCA, Jaguar, Groupe PSA, Honda, Hyundai, Kia, Mazda, MG, Nissan, Polestar, Renault, Rivian, Tesla, Mahindra, Tata Motors and Volkswagen Group,[2][3]
as well as Ford and General Motors through the 2024 model year for their North American EVs.[4]
Competing charging systems for high-power DC charging include CHAdeMO (widely used in Japan, previously used in North America and Europe)[5]GB/T (China),[6] and the North American Charging System developed by Tesla.[7]
History
The revival of interest in electric cars spurred deployment of charging stations. Initially, these accessed the abundant AC mains electricity using a variety of plugs around the world. The standardization in IEC 62196 for higher-current charging connectors brought about various systems: Type 1 was used primarily in North America and Japan, and Type 2 variants elsewhere. For DC charging, the SAE and European Automobile Manufacturers Association (ACEA) made a plan to add common DC wires to the existing AC connector types such that there would be only one "global envelope" that fitted all DC charging stations.[8]
The proposal for a "Combined Charging System" (CCS) was published at the 15th International VDI-Congress (Association of German Engineers) on 12 October 2011 in Baden-Baden. CCS defines a single connector pattern on the vehicle side that offers enough space for a Type 1 or Type 2 connector, along with space for a two-pin DC connector allowing charging at up to 200amps. Seven car makers (Audi, BMW, Daimler, Ford, General Motors, Porsche and Volkswagen) agreed in late 2011 to introduce CCS in mid-2012.[9][10] In May 2012, ACEA endorsed the standardization of the Combo 2 connector across the European Union.[11] ACEA were joined later that month by the European Association of Automotive Suppliers (CLEPA) and The Union of the Electricity Industry (EURELECTRIC).[12] Also that month, prototype implementations for up to 100 kW were shown at EVS26 in Los Angeles.[13] DC charging specifications in the IEC 62196-3 draft give a range up to 125 A at up to 850 V.[14]
The seven auto makers also agreed to use HomePlug GreenPHY as the communication protocol.[15] The prototype for the matching plug was developed by Phoenix Contact with the goal to withstand 10,000 connect cycles.[16] The standardization proposal was sent to the IEC in January 2011.[17] The request to use a PLC protocol for the Vehicle2Grid communication was made in September 2009 in a joint presentation of BMW, Daimler and VW at a California Air Resources Board ZEV Technology Symposium.[18] This competed with the CAN bus proposal from Japan (including CHAdeMO) and China (GB/T 20234.3, a separate DC connector standard), and none of their car manufacturers has signed up to CCS. However, China had been involved in early stages of the development of the extra DC pins.[16]
Volkswagen built the first public CCS quick-charge station providing 50 kW DC in Wolfsburg in June 2013 to test drive the VW E-Up that was to be delivered with a DC rapid charger connector for CCS.[19] Two weeks later, BMW opened its first CCS rapid charge station to support the BMW i3.[20] Since at least the second EV World Summit in June 2013, the CHAdeMO association, Volkswagen and Nissan all advocate multi-standard DC chargers, as the additional cost of a dual-protocol station is only 5%.[21]
In Germany, the Charging Interface Initiative e. V. (CharIN) was founded by car makers and suppliers (Audi, BMW, Daimler, Mennekes, Opel, Phoenix Contact, Porsche, TÜV SÜD and Volkswagen) to promote the adoption of CCS. They noted in a press release that most cars cannot charge faster than 50 kW, so that was the first common power output of CCS stations to be built during 2015. The next step was the standardization of stations with 150 kW output that they showed in October 2015, looking to a future system with 350 kW output.[22] Volvo joined CharIN in 2016;[23] Tesla in March 2016;[24]Lucid Motors (previously Atieva) June 2016;[25]Faraday Future June 2016; Toyota in March 2017.[26]
In the United States, BMW and VW claimed in April 2016 that the East Coast and West Coast corridors had "complete" CCS networks.[27] As part of the 2016 settlement of the Volkswagen emissions scandal, VW committed to spend US$2 billion in the United States over the following 10 years on CCS and other charging infrastructure through subsidiary company Electrify America.[28] In this effort, charging stations would be built with up to 150 kW at community-based locations and with up to 350 kW at highway locations. Besides CCS, CHAdeMO charging stations were to be constructed.[29]
In November 2016, Ford, Mercedes, Audi, Porsche and BMW announced they would build a 350 kW (up to 500 A and 920 V) charge network (IONITY) with 400 stations in Europe,[30] at a cost of €200,000 ($220,000) each.[31] Most electric cars have a battery pack voltage below 400 volts. With a maximum charge current of 500 A, up to 220 kW charging is possible.
EVSE manufacturers offer CCS chargers capable of outputs beyond 350 kW. The Terra 360[32] from ABB supports up to 360 kW charging.
In May 2022, EUROLOOP announced 720 kW charger WILLBERT Amber II S-HUB to be deployed in 2023 across Belgium.[42]
In December 2022, Fastned deployed EVBox Troniq High Power 400 kW chargers in De Watering, The Netherlands, along the A8 near Oostzaan as part of its charging network.[43]
In April 2023, Nxu demonstrated a battery-backed, 700 kW CCS charger[44] in Mesa, Arizona.
In May 2023, Shell opened a new station[45] with 400 kW Kempower chargers in Lonelier outside Kristiansand, Norway.
In June 2023, XC Power opened a new Recharge Station with QiOn Technology at Supercool Mobility Centers, a group of chargers with main power up to 990 kW with non-cooled CCS1 (up to 240 kW), and a charging station with liquid cooling system, up to 990 kW in Puebla City, Mexico. [46]
In first half of 2023, both Ford and General Motors announced that they would transition their North American EV lines from CCS1 to the NACS charge connector beginning with the 2025 model year.[4] These company moves to a competing charging standard prompted a response from the Charging Interface Initiative (CharIN) association, which promotes the CCS standard. They pointed out in June 2023 that "NACS is not a published or recognized standard by any standards body. For any technology to become a standard it has to go through due process in a standards development organization, such as ISO, IEC, and/or SAE."[47]
Technical design
Versions of the specifications
The Combined Charging System is meant to develop with the needs of the customer. Version 1.0 covered the currently common features of AC and DC charging, and version 2.0 addressed the near to midterm future. The specifications and underlying standards for CCS 1.0 and CCS 2.0 are described for DC charging in Table 1[citation needed] and for AC charging in Table 2.[48]
The automotive manufacturers supporting CCS committed themselves to migrate to CCS 2.0 in 2018.[citation needed] Thus it is recommended for charging station manufacturers to also support CCS 2.0 from 2018 onwards.
The specifications of CCS 3.0 were not yet precisely defined[as of?]. All features of previous versions shall be preserved to ensure backward compatibility. Potential additional features include:[citation needed]
Reverse power transfer
Inductive charging
Wireless charging communication
Bus charging with "pantograph" current collector
Charging communication
Unlike the connector and inlet, which depend on the geographical location, the charging communication is the same around the globe. Generally two types of communication can be differentiated.
Basic signaling (BS) is done using a pulse-width modulation (PWM) signal which is transferred over the control pilot (CP) contact according to IEC 61851-1. This communication is used for safety-related functions, indicating for example if the connector is plugged in, before contacts are made live (or energized) and if both charging station and electric vehicle are ready for charging. AC charging is possible using the PWM signal only. In this case the charging station uses the duty cycle of the PWM to inform the onboard charger of the maximum available current at the charging station (A pulse width of 5% indicates that HLC shall be used).
High-level communication (HLC) is done by modulating a high-frequency signal over the CP contact (also known as Power Line Communication or PLC) to transfer more complex information, which may be used e.g. for DC charging or for other services such as "plug and charge" or load balancing. High-level communication is based on the standard DIN SPEC 70121 and the ISO/IEC 15118-series.
Load balancing
CCS differentiates between two methods of load balancing.[citation needed]
Reactive load balancing allows changing the energy flow from Electric Vehicle Supply Equipment (EVSE) to EV instantaneously to a specific limit.
Scheduled load balancing supports reactive load balancing and additionally a planning of the energy flow from EVSE to EV with e.g. different power limits and cost indicators over time. It may for example be used to optimize energy distribution in a smart grid.
Charging authorization modes
For charge authorization, generally two approaches are foreseen.[by whom?]
With "plug and charge", the user plugs in their vehicle and an automated authentication and authorization process is started without any further user interaction. Payment is performed automatically.
With "external payment", the user has to identify with an RFID card at the terminal, or conduct a payment with a payment card, before they can proceed with charging.
The vehicle coupler is composed of the vehicle connector, which is mounted at the end of a flexible cable, and the vehicle inlet, the counterpart of the connector, which is located within the vehicle. The CCS couplers were based on the Type 1 coupler, the North American standard, and Type 2 coupler, the European standard, as described in IEC 62196-2. One of the challenges of the Combined Charging System was to develop a vehicle inlet which is compatible with both the existing AC vehicle connectors and additional DC contacts. For both Type 1 and Type 2 this has been accomplished by extending the inlet with two additional DC contacts below the existing AC and communication contacts. The resulting new configurations are commonly known as Combo 1 and Combo 2.
For the DC vehicle connector, the implementation varies slightly between Combo 1 and Combo 2. In the case of Combo 1 the connector is extended by two DC contacts, while the Type 1 portion of the connector remains the same with the AC contacts (L1 & N) being unused. For Combo 2 the AC contacts (L1, L2, L3 & N) are completely removed from the connector and therefore the Type 2 portion of the connector has only three contacts remaining – two communication contacts and a protective earth. The vehicle inlet may retain AC contacts to allow non-CCS AC charging.
In both cases, communication and protective earth functions are covered by the original Type 1 or 2 portion of the connector. The Type 1 and Type 2 connectors are described in IEC 62196-2, while the Combo 1 and Combo 2 connectors are described in IEC 62196-3 as Configurations EE and FF.[citation needed]
As vehicle couplers for DC charging according to IEC 62196-3:2014 Ed.1 allow DC charging only with currents up to 200 A, they do not sufficiently cover the needs of the future charging infrastructure. Consequently, a later edition of the standard supports currents of up to 500 A. Such high currents, however, either require large cable cross-sections, leading to heavy and stiff cables, or require cooling if thinner cables are desired. In addition, contact resistance leads to more heat dissipation. To cope with these technical issues, the standard IEC TS 62196-3-1 describes the requirements for high-power DC couplers including thermal sensing, cooling and silver-plating of contacts.[49] CharIN are investigating versions over 2 MW for electric trucks, and equipment is being tested.[50][51]
Competition for global acceptance
The Combined Charging System is primarily driven by European and North American car manufacturers. Type 1 and Combo 1 chargers are primarily found in North and Central America, Korea and Taiwan, while Type 2 and Combo 2 can be found in Europe, South America, South Africa, Arabia, India, Thailand, Singapore, Taiwan, Hong Kong, Oceania and Australia. For DC charging the competing standard GB/T 20234-2015 is used in China, while Japan uses CHAdeMO.
In the European Union, according to Directive 2014/94/EU[52] all high-power DC charging points installed after November 18, 2017, were to be equipped for interoperability purposes at least with Combo 2 connectors.[citation needed] However, this does not prohibit the provision of other charging points using e.g. CHAdeMO or AC Rapid.
The majority[53] of EVs sold in the United States are made by Tesla and therefore do not natively support CCS charging, but instead used the proprietary Tesla connector from the early-2010s through 2022, though newer Tesla cars also support CCS with a separately sold adapter.[54] In November 2022, Tesla renamed its previously proprietary charging connector to the North American Charging Standard (NACS), making the specifications available to other EV manufacturers and allowing it to support the same signalling standard as CCS.[55][56][57][58]
In 2023, Ford Motor Company, General Motors, and Rivian announced that they would use NACS instead of CCS connectors on all future North American BEV models. Vehicles will initially come with an adapter in 2024, but new models starting from 2025 will be built with native NACS ports.[59][60][61]
Subsequently, other EV companies signed agreements for native NACS adoption, including Aptera, BMW Group, Fisker, Honda, Hyundai Motor Group, Jaguar, Lucid, Mercedes-Benz, Nissan, Polestar, Subaru, Toyota, and Volvo. Many major charging networks and charging equipment suppliers also announced support for NACS, including EVgo, FLO, ABB E-Mobility, and EverCharge. NACS was subsequently ratified internationally as standard SAE J3400.
This has led to predictions that CCS1 will soon be obsolete, as it is bigger, heavier and more expensive than NACS.[62][63][64][65][66]
As a result, Hilton Worldwide announced an agreement with Tesla to install 20,000 EVSEs across 2,000 of its properties in North America by 2025.[67]
In many other countries no standard is preferred yet, although CharIN recommended advanced Type 2 and Combo 2 in 2018.[68]
^Directive 2014/94/EU(on the deployment of alternative fuels infrastructure) (Report). European Parliament. 22 October 2014. Appendix II … Technical specifications for recharging points … Direct current (DC) high power recharging points for electric vehicles shall be equipped, for interoperability purposes, at least with connectors of the combined charging system 'Combo 2' as described in standard EN 62196-3.
^Directive 2014/94/EU(on the deployment of alternative fuels infrastructure) (Report). European Parliament. 22 October 2014. Retrieved 2022-07-07. Appendix II … Technical specifications for recharging points … Direct current (DC) high power recharging points for electric vehicles shall be equipped, for interoperability purposes, at least with connectors of the combined charging system 'Combo 2' as described in standard EN 62196-3.
Renato RascelRascel dalam The Overcoat (1952)LahirRenato Ranucci(1912-04-27)27 April 1912Torino, ItaliaMeninggal2 Januari 1991(1991-01-02) (umur 78)Roma, ItaliaPekerjaanPemeran, penyanyi, penulis laguTahun aktif1942–1972 Renato Rascel (pengucapan bahasa Italia: [reˈnaːto ˈraʃʃel]), nama panggung Renato Ranucci (diucapkan [raˈnuttʃi]; 27 April 1912 – 2 Januari 1991), adalah seorang pemeran film, penyanyi, dan penulis lagu Italia. Ia tampil dalam 50...
Lembaga Studi Sosial dan AgamaSingkataneLSATanggal pendirian16 Agustus 2005; 18 tahun lalu (2005-08-16)StatusLembaga nirlabaTipeNGOTujuanIkut aktif dalam proses membangun demokrasi di Indonesia supaya tercipta tatanan sosial, politik, ekonomi, hukum yang adil dan beradab.[1]Kantor pusatKota SemarangLokasiPerum Bukit Walisongo Permai (Perum Depag) Jalan Sunan Ampel Blok V Nomor 11, Tambakaji, Ngaliyan, Semarang - 50185[2]Wilayah layanan IndonesiaBahasa resmi Bahasa Indones...
Adipati Soběslav Sobeslaus I (Bahasa Ceska: Soběslav I) Oldrich (sekitar 1075 - 14 Februari 1140) merupakan Adipati Bohemia dari tahun 1125 sampai kematiannya. Ia adalah anggota keluarga Dinasti Přemyslid, putra bungsu Vratislaus II (wafat 1092), adipati Bohemia pertama yang juga memerintah sebagai raja, dengan istri ketiganya Świętosława dari Polandia. Kehidupan Soběslav pertama kali didokumentasikan sekitar tahun 1107, ketika ia dan abangnya Adipati Borivoj II dari Bohemia diusir ole...
American politician This article is about the U.S. Representative from Virginia. For persons of a similar name, see Lewis Payne (disambiguation). Lewis F. PayneMember of the U.S. House of Representativesfrom Virginia's 5th districtIn officeJune 14, 1988 – January 3, 1997Preceded byDan DanielSucceeded byVirgil Goode Personal detailsBornLewis Franklin Payne Jr. (1945-07-09) July 9, 1945 (age 78)Amherst, Virginia, U.S.Political partyDemocraticAlma materVirginia Milita...
Village in Maharashtra This article is an orphan, as no other articles link to it. Please introduce links to this page from related articles; try the Find link tool for suggestions. (February 2018) Village in Maharashtra, IndiaPondhvadiVillageCountry IndiaStateMaharashtraDistrictSolapur districtLanguages • OfficialMarathiTime zoneUTC+5:30 (IST) Pondhvadi is a village in the Karmala taluka of Solapur district in Maharashtra state, India. Demographics Covering 1,222 hectares (3...
Food mix with long shelf life, sometimes used as survival food PemmicanPemmican ballTypeAgglomerationCourseMain coursePlace of originNorth AmericaRegion or stateNorth AmericaMain ingredientsBison, deer, elk or moose Media: Pemmican Pemmican (also pemican in older sources)[1][2] is a mixture of tallow, dried meat, and sometimes dried berries. A calorie-rich food, it can be used as a key component in prepared meals or eaten raw. Historically, it was an important part o...
Gasol dengan Chicago Bulls Pau Gasol PosisiPower forward/Center LigaNBATinggi7 ft 0 in (2,13 m) Berat250 lb (114 kg)Negara SpanyolLahir6 Juli 1980 (umur 43)Sant Boi de Llobregat, Barcelona, SpanyolDraftke-3, 2001 Atlanta HawksKarier pro1999 – sekarangKlub sebelumnya FC Barcelona (Spain) (1999–2001)Memphis Grizzlies (2001–2008)Penghargaan2001 Spanish King's Cup MVP2001 All-Euroleague Second Team2001 Spanish League Finals MVP2002 NBA Rookie of the Y...
Westinghouse Electric CorporationJenisPublikNasibDibubarkanPenerusWestinghouse Electric Company, Westinghouse Licensing Corporation, ViacomDidirikanPittsburgh, Pennsylvania, A.S. (08 Januari 1886 (1886-01-08))PendiriGeorge WestinghouseDitutup1999 (1999)KantorpusatKotapraja Cranberry, Pennsylvania, Amerika SerikatWilayah operasiSeluruh duniaAnakusahaCBS Westinghouse Electric Corporation adalah sebuah perusahaan pabrik Amerika. Perusahaan tersebut didirikan pada 8 Januari 1886, dengan...
Airport in Little Rock, Arkansas, United States Clinton National AirportAdams FieldIATA: LITICAO: KLITFAA LID: LITSummaryAirport typePublicOwnerCity of Little RockOperatorLittle Rock Municipal Airport CommissionServesLittle RockOpenedJune 19, 1931; 92 years ago (1931-06-19)[1]Elevation AMSL266 ft / 81 mCoordinates34°43′48″N 92°13′12″W / 34.73000°N 92.22000°W / 34.73000; -92.22000Websiteclintonairport.comMapsFAA airpo...
1931 film Different MoralsDirected byGerhard LamprechtWritten byBruno Frank (play Perlenkomödie)Gerhard LamprechtStarringWalter RillaAribert WäscherElga BrinkCinematographyKarl HasselmannAlbert Schattmann [de]Edited byErich R. SchwabMusic byGiuseppe BecceProductioncompanyTobis FilmDistributed byNational FilmRelease date 5 January 1931 (1931-01-05) Running time86 minutesCountryGermanyLanguageGerman Different Morals (German: Zweierlei Moral) is a 1931 German comedy...
County in Georgia, United States County in GeorgiaWheeler CountyCountyWheeler County Courthouse (built 1917), AlamoLocation within the U.S. state of GeorgiaGeorgia's location within the U.S.Coordinates: 32°07′N 82°43′W / 32.12°N 82.72°W / 32.12; -82.72Country United StatesState GeorgiaFoundedNovember 5, 1912; 112 years ago (1912)Named forJoseph WheelerSeatAlamoLargest cityAlamoArea • Total300 sq mi (800 km2...
Set of ideas and practices adopted by Scientologists This article is about the set of ideas and practices. For the 1950 book, see Dianetics: The Modern Science of Mental Health. For the article in Astounding Science Fiction, see Dianetics: The Evolution of a Science. Not to be confused with dialectics or Dynetics. This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article possibly conta...
Diese Liste zählt die Mitglieder der Hamburgischen Bürgerschaft während der 15. Wahlperiode (1993–1997) auf. Inhaltsverzeichnis A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Bild Name Fraktion Anmerkungen Petra Adam-Ferger SPD Barbara Ahrons CDU Andreas Bachmann GAL Rolf-Peter Bakker SPD Ab dem 15. August 1996 Ausübung des Bürgerschaftsmandats eines Senators. Günter Barnbeck SPD Vom 6. Oktober bis 15. Dezember 1993 und ab dem 17. Januar 1995 Ausübung des Bürgerschaftsmandats e...
Resolusi 405Dewan Keamanan PBBBeninTanggal14 April 1977Sidang no.2.005KodeS/RES/405 (Dokumen)TopikSituasi di BeninHasilDiadopsiKomposisi Dewan KeamananAnggota tetap Tiongkok Prancis Britania Raya Amerika Serikat Uni SovietAnggota tidak tetap Benin Kanada Jerman Barat India Libya Mauritania Pakistan Panama Rumania Venezuela Resolusi Dewan Keamanan Perserikatan Bangsa-Bangsa 405, diadopsi pada 14 April 1977. Us...
Betty William nel 1996 Premio Nobel per la pace 1976 Betty Williams (Belfast, 22 maggio 1943 – Belfast, 17 marzo 2020) è stata un'attivista britannica. Ha ricevuto, assieme a Mairead Corrigan, il Premio Nobel per la Pace nel 1976 per il suo ruolo di cofondatrice della Community of Peace People, un'organizzazione che si batteva per una soluzione pacifica della questione dell'Irlanda del Nord. In seguito è stata a capo della Global Children's Foundation ed è stata presidente del World ...
State highway in central New Hampshire, US New Hampshire Route 127Map of central New Hampshire with NH 127 highlighted in redRoute informationMaintained by NHDOTLength31.636 mi[1] (50.913 km)Major junctionsSouth end US 202 / NH 9 in HopkintonMajor intersections I-89 in Hopkinton US 4 in Salisbury US 3 / NH 3A / NH 11 in Franklin I-93 in SanborntonNorth end NH 132 in Sanbornton LocationCountryUnited StatesS...
TV series or program The CollegeHumor ShowCreated byRicky Van VeenSam ReichScott TomlinsonStarringAmir BlumenfeldPatrick CasselsDan GurewitchJake HurwitzSam ReichJeff RubinSarah SchneiderStreeter SeidellRicky Van VeenCountry of originUnited StatesNo. of seasons1No. of episodes6 (list of episodes)ProductionExecutive producersRicky Van VeenSam ReichScott TomlinsonJosh AbramsonCamera setupFilm, Single cameraRunning timeapprox. 21 minutesOriginal releaseNetworkMTV (2009)ReleaseFebruary 8 (2...
Painting by Sandro Botticelli Madonna and Child with an AngelArtistSandro BotticelliYear1465–1467MediumTempera on panelDimensions87 cm × 60 cm (34 in × 24 in)LocationSpedale degli Innocenti, Florence The Madonna and Child with an Angel is a painting executed c. 1465–1467 by the Italian Renaissance painter Sandro Botticelli. It is housed in Spedale degli Innocenti of Florence. A majority of Botticelli's works date to the 1480s.[1] This pa...