The third and final phase, comprising extensions between Hawthorne Lane and Eastland CTC, and from French Street to Rosa Parks CTC, has been planned, but lacks funding. Originally projected to be 10 miles (16 km) long with 35 stops,[11] the Gold Line when fully completed is intended to connect the University Park area of west Charlotte with Eastland Community Transit Center in east Charlotte via Uptown Charlotte.[12]
History
Initial plans
In 1994, the City of Charlotte and Mecklenburg County jointly approved a "Centers and Corridors Vision", a comprehensive plan which focused future regional development along five major transport corridors.[13] In support of this plan, a "2025 Integrated Transit/Land Use Plan" in 1998 reviewed transit options for five transportation corridors in the Charlotte metro area, including the Center City corridor.[13] Voters approved a half-cent sales and use tax to support the plan in November 1998.[13] In November 2002, the Charlotte city council adopted the "2025 Transit Plan", which selected a streetcar as the preferred transit option for the Center City corridor.[13]
As originally conceived, the plan envisioned a single streetcar line, the "Trade Street Streetcar", linking Presbyterian Hospital (eastern portion of the line) and Johnson C. Smith University (western portion), with three subsequent extensions:[13]
A Central Avenue extension from the Presbyterian Hospital end of Elizabeth Avenue (a continuation of Trade Street) to the vicinity of Eastland Mall, running along Central Avenue for most of the route
A Beatties Ford Road extension from the vicinity of Johnson C. Smith University, continuing along Trade Street and Beatties Ford Road to near I-85.
A Downtown Streetcar Loop following a route "defined as some combination of 11th Street, 10th Street, 9th Street, 8th Street or 7th Street on the north side, McDowell Street or Davidson Street on the east side, Stonewall Street or Second Street on the south side, and Graham Street, Mint Street or Pine/Poplar Streets on the west side."
In June 2006 initial costs for the completion of the Center City Corridor streetcar line were roughly estimated at $250 million.[11] The line was then intended to replace the No. 7 and No. 9 CATS bus routes serving Beatties Ford Road and Central Avenue, respectively.[11] With cost and ridership projection estimates made, the Metropolitan Transit Commission (MTC) voted on the priority for its construction in November 2006. At its November meeting the MTC voted to prioritize the construction and completion of both the Blue Line Extension to UNC Charlotte and the Red Linecommuter rail to Lake Norman, with the Central City streetcar coming third.[14] At the same time, the MTC determined that initial engineering studies for the corridor would commence in 2013 with a phased completion by 2023.[14] Although construction was not slated to commence until the mid-2010s, streetcar tracks were installed as part of a streetscape project along the Elizabeth Avenue segment between CPCC and Presbyterian Hospital, to be complete by 2009.[15]
Although the streetcar line had been given third priority by the MTC, by 2008 CATS began to determine means to speed up its construction and have it operational by 2013.[16] To further expedite the project, in May 2008, the Charlotte City Council approved $500,000 to study the corridor in terms of an updated cost estimate, economic benefits and the eligibility of the corridor for federal funding.[17] To complete the line by 2013, however, CATS stated that additional capital would be required as other projects had already been budgeted for and were in progress.[17]
In the spring of 2010, the Federal Transit Administration awarded the project a $25 million grant. On September 19, 2011, U.S. Transportation Secretary Ray LaHood formally awarded Charlotte the grant for a 1.5-mile (2.4 km) starter streetcar line from Time Warner Cable Arena to Presbyterian Hospital. Construction began in December 2012, with the line expected to open for service in 2015. Total costs were estimated at $37 million, with the city paying $12 million; however, the city did not then state how it would pay for an estimated $1.5 million in operating costs.[18]
Construction and opening of Phase 1
In November 2012, the Charlotte city council awarded a $26.3 million contract for construction of the starter segment to a partnership between Balfour Beatty Rail and Blythe Development Company.[19] The groundbreaking for the initial segment took place on December 12, 2012, in front of Presbyterian Hospital, with Secretary of Transportation Ray LaHood, Mayor Foxx and other officials in attendance.[2] By May 2014, Phase 1 was 45 percent complete.[20][21]
While the starter line had originally been scheduled to open in March 2015, in January 2015 the opening date was moved to June due to construction errors on the part of the contractor, with a subsequent postponement to July 2015.[9][4] On July 14, 2015, the Phase 1 section of the Gold Line began service. U.S. Secretary of Transportation and former Charlotte mayor Anthony Foxx, a primary backer of the project, delivered the keynote speech.[10]
Phase 2
Planning (2012–2014)
In early 2012, Mayor Anthony Foxx proposed building the next stage of the streetcar line, a 2.5-mile (4.0 km), $119 million segment which would extend the line to Johnson C. Smith University. The proposal was turned down by a majority of the city council; on June 30, Foxx vetoed a revised city budget by the council which would have eliminated the second phase. On October 30, further discussion failed to reach any consensus on how best to pay for its construction. Options considered included: charging fares for the streetcar (the city had planned for the streetcar to be free), increasing the special property tax rate charged to property owners inside Interstate 277, soliciting donations from businesses and institutions along the line, such as Johnson & Wales University, or using a portion of new property taxes created from development along the line. Other options to raise funds, which would have required approval from the state, included: increasing the rental car tax, hotel/motel tax or prepared food and beverage tax, levying a special fee on parking spaces or lobbying for a higher vehicle registration fee.[22]
Many city council members stated they did not favor an increase in property taxes to build the segment. In an effort to end the continuing deadlock, on December 10 Foxx proposed two alternative budgets, the smaller of which would eliminate the streetcar extension;[23] however, on December 17 the city council voted to postpone all budget decisions until early 2013.[24] At a meeting in Raleigh on January 31, 2013, Pat McCrory, the newly elected Governor of North Carolina and former mayor of Charlotte, told Charlotte's city attorney and its deputy city manager Ron Carlee that state funding for the Blue Line Extension could be at risk if Charlotte persisted with plans to build an extension to the streetcar line.[25] On April 10, 2013, the project was temporarily dropped from the budget, though Carlee hoped to have a separate streetcar plan ready to vote on by June 2013.[26]
After protracted debate, on May 13, 2013, Ron Carlee, the new Charlotte city manager, said the $126 million extension to what had been renamed the CityLynx Gold Line could be funded without a property tax increase if the city could receive a federal grant for half the estimated cost, possibly through the Federal Transit Administration's New Starts Program. The remaining $63 million could be covered with surplus funds from other city programs. City council members voted to send the proposal to the Metropolitan Transit Commission on May 22, and with their approval, take a vote on May 28.[27] On May 15, 2013, Bay Area Economics, an independent consultant hired by the city in 2009 to conduct a streetcar economic impact study, reported the proposed second phase could generate 1,100,000 square feet (102,193 m2) of new development for the city by 2035, and nearly $2.4 million in new property taxes.[28] On May 28, the Charlotte city council voted 7-4 to build the Phase 2 extension, setting aside $63 million for the purpose; the new segment would extend from Sunnyside Avenue to French Street.[29][20] On September 3, it was reported the Gold Line extension had been passed over for a federal TIGER (Transportation Investment Generating Economic Recovery) grant, intended to cover the remaining $63 million it would cost to build the line.[30] On November 13, the city announced it would apply to the Federal Transit Administration for permission to begin planning the line in detail.
Design (2014–2017)
On January 27, 2014, the Charlotte city council voted 8–3 to spend up to $12 million on engineering work for the extension. Carlee said the city would have to spend some of the $63 million it had allocated for the extension in May to demonstrate to the FTA that the project was viable.[31] On February 26, the FTA issued its approval for CATS to begin project development for the extension and to apply for the Federal Small Starts grant in September 2014.[32] On September 8, 2014, the Charlotte city council voted 7-4 to build the second phase and proceed with applying for the federal grant. As part of the extension project, the Hawthorne Lane bridge over Independence Boulevard would be replaced to handle the weight of the streetcars.[33]
On June 22, 2015, the Charlotte city council voted 7–4 to approve $7.7 million for further Phase 2 design work.[34] The initial request for construction bids returned two bids in July 2016 that came in over budget, leading CATS to request a second round of bidding the following month.[35] In November 2016, Siemens Mobility was awarded a $40 million contract for low-floor streetcars and associated parts to service the entire Gold Line route.[36][37] On November 28, the council awarded a $94 million construction contract to Johnson Bros. Corporation to build the 2.5 miles (4.0 km) of trackage in Phase 2, as well as associated road and landscaping work.[36]
Construction (2017–2021)
Construction began with a groundbreaking ceremony on January 14, 2017,[38] with completion required by August 31, 2020, under the terms of the federal funding used.[36] Starting on June 3, 2019; CATS replaced streetcar service along the line with a shuttle bus in order to facilitate construction of Phase 2 and increase the heights of the existing stations by a few inches to accommodate the new Siemens streetcars. Streetcar service was initially slated to resume in 2020, but was pushed back to 2021 to accommodate the 2020 Republican National Convention.[39] Supply shortages, a contractor ordering the wrong girders for the Hawthorne Lane bridge,[6][40] the COVID-19 pandemic and the George Floyd protests further delayed the opening of the section.[41] Test trains began running along the route in February 2021,[42][43] with pre-revenue testing beginning from May 10.[44] Phase 2 began service at 5:00 a.m. on August 30, 2021, with the first passengers boarding at the Hawthorne & 8th stop.[5][45]
Future construction (Phase 3)
The third and final phase of the CityLynx Gold Line, comprising extensions between Hawthorne Lane and Eastland CTC, and from French Street to Rosa Parks CTC, has been planned, but lacks funding. This 6-mile-long (9.7 km) segment was originally scheduled for completion by 2023 at a cost of $231 million.[10] In early April 2021, the city of Charlotte issued requests for qualifications for prospective firms to build the final phase of the Gold Line, which by then had been 30% designed. Firms were given until April 30 to apply, with final selections to be made by June 4 at the latest.[46]
As of 2021, no cost estimates have been developed for the third phase, nor have local, state or federal funds been allocated for construction.[46]
According to John Lewis, CATS CEO, the final phase of the Gold Line will cost significantly more than the previous two phases, as the 4-mile-long (6.4 km) segment from Sunnyside Avenue near Novant Health Presbyterian Medical Center to the former Eastland Mall property near North Sharon Amity Road requires faster travel times, necessitating construction of a separate track in that area instead of having the streetcar share the road with traffic. This would make the streetcar function more like a light rail line in that stretch of rail.[46] The remaining 2 miles (3.2 km) of track extending west from French Street near Johnson C. Smith, and running along Beatties Ford Road to the Rosa Parks Place Community Transit Center, will include new bridges over Brookshire Boulevard and I-85.[46] The route is estimated to be completed in 2033.[7]
Operation
Fares
The Gold Line was intended to have been fare-free until January 2022, when standard CATS fares would have been introduced.[5] Due to ongoing COVID-19 pandemic-related workforce shortages, however, CATS officials decided to indefinitely postpone revenue service until enough rail operators were available to ensure sufficiently reliable service.[47]
Hours
The CityLynx Gold Line operates seven days a week from 5 a.m. to 2 a.m.[8]
In 2015, during its first month of operation, weekday ridership on the first phase of the CityLynx Gold Line exceeded initial projections, averaging 1,507 trips against an official projection of 1,100 trips.[48] In its first year, Phase 1 averaged 1,600 weekday trips,[49] slightly falling to an average of 1,480 weekday trips by July 2017.[50] Ridership declined by 41.9 percent over the following year, with the line only averaging 803 weekday trips in July 2018.[51] As of April 2019, the last month for which figures were available before service was temporarily suspended, weekday ridership averaged 687 trips.[52] At the opening of the second phase in 2021, CATS CEO John Lewis said the daily ridership goal for the newly expanded line would be 4,100 daily trips. He expected this target would be achieved by roughly 2023 due to COVID-19-induced declines in public transit ridership.[53] In its first full month of operation, the expanded Gold Line averaged 1,230 weekday trips.[54] One year after it had reopened, the line averaged 1,895 weekday trips.[55]
Per the original plan, in 2006 CATS estimated the Gold Line would have an average daily ridership of between 14,200 and 16,700 passengers when fully completed.[11]
Criticism
The CityLynx Gold Line project has been criticized for its high cost and limited projected benefits for the areas it is intended to serve, though the net benefits from future development as a result of the streetcar line are difficult to assess.[33] Recent cost-benefit analyses have shown that at a cost of $1.58 per passenger mile (predicted for 2019), it would cost twice as much to operate as either city bus (77 cents/passenger mile, in 2012) or light rail services (68 cents/passenger mile, in 2012), while traveling over a shorter distance.[56] Since its opening, the Gold Line streetcar has been criticized for its street running design, instead of having a dedicated right of way; this has been cited as contributing to frequent service delays.[57]
^ abRubin, Richard (November 16, 2006). "Rail plans to north, university roll ahead". The Charlotte Observer. pp. 1A.
^Rubin, Richard (January 7, 2007). "Lay track. Wait years. Ride - Plan: Streetcars to roll a decade after rails in place". The Charlotte Observer. pp. 1B.
^Harrison, Steve (March 28, 2008). "Streetcar move-up has CATS pressed". The Charlotte Observer. pp. 1B.
^ abTierney, Dan (June 1, 2008). "City OKs further study of streetcars, their costs". The Charlotte Observer. pp. 1M.
^Harrison, Steve (September 20, 2011). "Charlotte streetcar project could bring up to 385 jobs". The Charlotte Observer.
Biara Fransiskan dengan Basilika Kunjungan Perawan Maria dilihat dari Kastil Güssing Biara Fransiskan dan Gereja Biara Güssing adalah sebuah kompleks biara dan basilika Katolik yang terletak di kota Güssing di Distrik dengan nama yang sama di Burgenland, Austria. Seluruh kompleks awalnya merupakan bagian dari bekas benteng kota dan sekarang berada di bawah Perlindungan Monumen. Biara dan gereja peziarahan Kunjungan Mariä, yang ditingkatkan menjadi basilika minor pada tahun 2013, merupakan...
Painting by Antoine Watteau You can help expand this article with text translated from the corresponding article in French. (July 2018) Click [show] for important translation instructions. View a machine-translated version of the French article. Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated tex...
Provinsi di Kamboja Pembagian administratif Kamboja secara resmi terdiri atas lima tingkat. Pada tingkat pertama, Kamboja dibagi menjadi 24 provinsi (ខេត្ត, khaet) dan satu wilayah administratif khusus (រាជធានី, reach thani) Phnom Penh. Pada tingkat kedua, provinsi dibagi menjadi distrik (ស្រុក, srok). Salah satu distrik provinsi menjadi ibu kota provinsi (ក្រុង, krong). Pada tingkat ketiga, distrik dibagi menjadi komune (ឃុំ, khum). Pada ting...
County in Missouri, United States County in MissouriBates CountyCountyBates County Courthouse in ButlerLocation within the U.S. state of MissouriMissouri's location within the U.S.Coordinates: 38°16′N 94°20′W / 38.26°N 94.34°W / 38.26; -94.34Country United StatesState MissouriFoundedJanuary 29, 1841[1]Named forFrederick BatesSeatButlerLargest cityButlerArea • Total851 sq mi (2,200 km2) • Land837 sq...
Blomberg, Jalometalli 2008 Jan Axel Blomberg, juga dikenal dengan nama panggung Hellhammer, Mr. Hellhammer, Hauptman Hammer, Jan Axel Von Blomberg, dan Von Blomberg, adalah seorang drummer black dan avant-garde metal dari Oslo, Norwegia. Ia menggunakan Sabian Cymbals, Axis Pedals, dan Pearl drums, dan kadang juga Yamaha drums. Ia dikenal sebagai drummer band Mayhem, bergabung pada 1988 setelah Kjetil Manheim keluar. Selain Mayhem, salah satu band lainnya adalah Arcturus yang ia bentuk dengan ...
العلاقات اليمنية الكيريباتية اليمن كيريباتي اليمن كيريباتي تعديل مصدري - تعديل العلاقات اليمنية الكيريباتية هي العلاقات الثنائية التي تجمع بين اليمن وكيريباتي.[1][2][3][4][5] مقارنة بين البلدين هذه مقارنة عامة ومرجعية للدولتين: وجه المقا...
Italian football club Football clubSiracusaFull nameSiracusa Calcio 1924 SSD Siracusa Calcio 1924Nickname(s)Azzurri (All-Blues), AretuseiFounded1924 (Tommaso Gargallo)1937 (A.S. Siracusa)1996 (U.S. Siracusa)2013 (Siracusa Calcio)2019 (A.S.D. Siracusa)•2000 in Marina di Ragusa2021 (relocation to Syracuse)GroundStadio Nicola De Simone, SyracuseCapacity5,946[1]ChairmanAlessandro RicciLeagueSerie D Group I2022–23Eccellenza Sicily Group B, 2nd of 16 (promoted) Home colours Away colours...
Звукорежиссёр за микшерным пультом во время перезаписи фонограммы Озву́чивание[1], озву́чение[2][3] (не «озвуча́ние»[4] и не «озвуче́ние»[4])[* 1] фильма — процесс записи звукового сопровождения фильма, осуществляемый отдельно от съёмки изображ...
1973 Race of Champions Non-championship race in the 1973 Formula One season Race detailsDate 18 March 1973Official name VIII Race of ChampionsLocation Brands HatchCourse Permanent racing facilityCourse length 4.264 km (2.65 miles)Distance 40 laps, 170.554 km (105.977 miles)Pole positionDriver Jean-Pierre Beltoise BRMTime 1:21.1Fastest lapDrivers Jean-Pierre Beltoise BRMFastest lap Niki Lauda BRMFastest lap Ronnie Peterson Lotus-CosworthTime 1:23.0PodiumFirst Peter Gethin Chevron-ChevroletSeco...
Artikel ini memiliki beberapa masalah. Tolong bantu memperbaikinya atau diskusikan masalah-masalah ini di halaman pembicaraannya. (Pelajari bagaimana dan kapan saat yang tepat untuk menghapus templat pesan ini) Netralitas artikel ini dipertanyakan. Diskusi terkait dapat dibaca pada the halaman pembicaraan. Jangan hapus pesan ini sampai kondisi untuk melakukannya terpenuhi. (Pelajari cara dan kapan saatnya untuk menghapus pesan templat ini) Artikel ini mungkin mengandung riset asli. Anda dapat...
American politician For other people with the same name, see Jack Wagner (disambiguation). Jack Wagner50th Auditor General of PennsylvaniaIn officeJanuary 18, 2005 – January 15, 2013GovernorEd RendellTom CorbettPreceded byBob Casey Jr.Succeeded byEugene DePasqualeMember of the Pennsylvania Senatefrom the 42nd districtIn officeMay 24, 1994 – January 18, 2005[1]Preceded byEugene ScanlonSucceeded byWayne FontanaPresident of the Pittsburgh City CouncilIn officeNovemb...
Carlo V riceve la Confessio Augustana Le assemblee denominate Dieta di Augusta furono le sedute della Dieta del Sacro Romano Impero avvenute nella città tedesca di Augusta (Augsburg), dal 952 al 1582. Indice 1 Diete di Augusta 1.1 Dieta del 1500 1.2 Dieta del 1518 1.3 Dieta del 1530 («Confessione augustana») 1.4 Dieta del 1547-1548 («Interim di Augusta») 1.5 Dieta del 1550-1551 1.6 Dieta del 1555 (Pace di Augusta) 1.7 Dieta del 1559 1.8 Dieta del 1566 1.9 Dieta del 1582 2 Note 3 Bibliogr...
Pour les articles homonymes, voir Fourier et Saint Pierre. Ne doit pas être confondu avec Pierre Fourrier. Pierre Fourier Tableau de saint Pierre Fourier à la basilique Saint-Pierre-aux-Liens à Rome, Italie. Saint, fondateur, réformateur Naissance 30 novembre 1565Mirecourt, duché de Lorraine, Décès 9 décembre 1640 (75 ans) Gray, comté de Bourgogne, Saint-Empire romain germanique Nationalité Lorrain Ordre religieux Augustins Vénéré à Mattaincourt, Lorraine Béatification 2...
1999 studio album by OrbitalThe Middle of NowhereStudio album by OrbitalReleased5 April 1999Recorded1997–1998GenreTechno, house, ambient technoLength63:59LabelFFRRLondon/Sire Records (US)ProducerOrbitalOrbital chronology In Sides(1996) The Middle of Nowhere(1999) The Altogether(2001) Singles from The Middle of Nowhere StyleReleased: 8 March 1999 Nothing LeftReleased: 5 July 1999 The Middle of Nowhere is the fifth album released by Orbital. It was released in 1999, where it peaked a...
Russian politician In this name that follows Eastern Slavic naming customs, the patronymic is Revoldovich and the family name is Ammosov. Petr AmmosovПётр Аммосовofficial portrait, circa 2021Member of the State Duma for the Republic of Sakha (Yakutia)IncumbentAssumed office 12 October 2021Preceded byFedot TumusovConstituencyYakutia-at-large (No. 24) Personal detailsBorn (1966-09-22) 22 September 1966 (age 57)Yakutsk, Yakut ASSR, RSFSR, USSRPolitical partyCommunist Part...
Artikel ini bukan mengenai Pekarangan. Halaman bangunan berupa taman. Halaman bangunan adalah areal tanah yang biasanya berdekatan dan menjadi bagian tak terpisahkan dengan suatu bangunan atau terkait dengan kepemilikan dalam suatu persil. Tanah ini dapat diplester, dipakai untuk berkebun, ditanami bunga, atau kadang-kadang memiliki kolam. Halaman bangunan dapat berada di depan, belakang atau samping sebuah bangunan, tergantung seberapa besar sisa tanah yang tersedia setelah dipakai untuk ban...