Ceneri Base Tunnel

Ceneri Base Tunnel
North portal in 2018
Overview
LineGotthard Line
LocationTicino, Switzerland
Coordinates46°07′09″N 8°59′27″E / 46.11917°N 8.99083°E / 46.11917; 8.99083
StatusOperational[1]
SystemSwiss Federal Railways (SBB CFF FFS)
CrossesMonte Ceneri
StartCamorino in the Magadino Flat near Bellinzona, canton of Ticino
EndVezia near Lugano, canton of Ticino
Operation
Opened4 September 2020
OwnerSBB Infrastructure
OperatorSBB CFF FFS
TrafficRailway
CharacterPassenger and freight
Technical
Length15.4 km (9.6 mi)[2]
No. of tracks2 single-track tubes[2]
Track gauge1,435 mm (4 ft 8+12 in) (standard gauge)
Electrified15 kV 16.7 Hz
Operating speed
  • Technical maximum speed: 250 km/h (160 mph)
  • Maximum authorized speed: 230 km/h (140 mph)
  • Operating speed (passenger): 200 km/h (124 mph) (normal) up to 230 km/h (143 mph) (if delay)[3]
  • Minimum speed (freight): 100 km/h (62 mph)
Route map

The Ceneri Base Tunnel (CBT, Italian: Galleria di base del Monte Ceneri) is a Swiss railway base tunnel in the canton of Ticino. It passes under Monte Ceneri between Camorino in the Magadino Flat and Vezia near Lugano; it bypasses the former high-altitude rail route through the Monte Ceneri Tunnel. It is composed of two single-track tunnels, each 15.4 km (9.6 mi) long.[4] It is part of the New Railway Link through the Alps (NRLA) project for faster north-south rail links across the Swiss Alps.

An exploration tunnel near Sigirino was excavated between 1999 and 2003 to gain geological data on the rock formations at the Ceneri Base Tunnel's level. Based on those data, it was decided to excavate most of the tunnel with traditional blasting methods and only drill a small part using a faster tunnel boring machine (TBM). Both the CBT and Gotthard Base Tunnels were built under contract from the Swiss Federal Government by Alptransit Gotthard AG. Construction of the two single-track bores started during March 2006. The official start of the CBT's construction phase was celebrated on 2 June 2006 with the laying of a foundation stone. The final breakthroughs took place on 21 January 2016 (west tube) and 26 January 2016 (east tube). Rail service started on 4 September 2020 and was operationalised for freight in December 2020.[5][6]

On opening, the Ceneri Base Tunnel has become an important southern feeder for the Gotthard Base Tunnel as the existing, proportionally steep and curvy track over Monte Ceneri is not suitable for high speeds or heavy freight trains. Another feeder is the Luino link along Lake Maggiore which is about to be upgraded by Italy in prospect of the opening of the Gotthard Base Tunnel. Both links meet in the Magadino Flat in the future Camorino Node (Italian: Nodo di Camorino). The CBT will ease local train traffic, mainly between the two major cities Locarno and Lugano but also between Bellinzona and Lugano. Travel time on the TILO, an S-Bahn, from Locarno to Lugano dropped from 50 to 22 minutes.

History

Background

Gotthard and Ceneri Base Tunnel. The route through Luino follows the lake shores.

The Ceneri Base Tunnel is the lowest of the routes through the Ceneri axis and connects Camorino in the Magadino Flat to Vezia near Lugano. It allows traffic to bypass the conventional high-level railway running through the historic Monte Ceneri Tunnel.[7] It forms only one element of a wider effort, commonly referred to as the New Rail Link through the Alps (NRLA) programme, which is being developed by AlpTransit Gotthard AG (ATG), a wholly owned subsidiary of the Swiss Federal Railways (SBB). When it became operational in December 2020, the Ceneri Base Tunnel began working together with the longer Gotthard Base Tunnel to significantly shorten the journey times between the Northern Swiss city of Zürich and the Northern Italian city of Milan by providing a flatter route for freight and passenger trains than previous conventional lines.[7][8]

The Ceneri Base Tunnel carries a pair of parallel bores, each containing a single-track, set 40 metres (130 ft) apart from one another and connected by cross passages at evenly spaced intervals of 325 metres (1,066 ft).[7] Stretching between the towns of Camorino and Vezia, it possesses a total length of 39.78 kilometres (24.72 mi); the eastern bore has a length of 15.45 kilometres (9.60 mi) and the west bore is 15.28 kilometres (9.49 mi) long. An operations center controlling ventilation and logistical activities has been constructed at Sigirino.[7] Operationally, the Ceneri Base Tunnel is anticipated to be used by in excess of 300 trains each day travelling in both directions. It shall be furnished with ETCS Level 2 signalling,[needs update] allowing for trains to traverse it at speeds of up to 250 kilometres per hour (160 mph).[9] Although the technical maximum speed is 250 km/h (160 mph) through the Ceneri tunnel, the maximal authorized speed has been reduced to 230 km/h (140 mph) for ecological and economical reasons, while the operating speed of passenger trains is restricted to 200 km/h (124 mph) in order to accommodate the freight traffic, with the possibility to accelerate up to 230 km/h in case of delay.[3]

For handling emergency situations in the Ceneri Base Tunnel, the Swiss Federal Railways has acquired a fleet of dedicated rescue trains; these are equipped with specialised fire fighting equipment and other useful facilities, such as independent air supplies.[10]

The Ceneri Base Tunnel was approved in July 2001 by the Swiss Federal Council, clearing the way for detailing planning activity to proceed.[7] Further Parliamentary approval of the selected route for the tunnel was received in 2003, and the first funds towards construction were released during 2005.[11] During April 2007, AlpTransit Gotthard AG awarded a Sfr85m ($91.52m) contract for the construction of the first underground element of the tunnel to Consorzio Monte Ceneri (CMC) JV, a consortium of CSC, Lugano, Frutiger, Thun, Rothpletz, Lienhard & Cie, and Aarau.[7] During June 2009, the Board of Directors of AlpTransit Gotthard AG announced that it had awarded the principal contract for the tunnel's construction to the Consorzio Condotte Cossi consortium. At the time, the tunnel was expected to be operational by December 2020.[12] This contract was valued at Sfr987 million ($1.6 billion). The estimated total cost for the Ceneri Base Tunnel is Sfr2.4 billion ($2.58 billion).[7]

Construction

Final works in the west tube.

During June 2006, construction work on the tunnel officially commenced.[7] In November 2008, the excavation of a 2.4-kilometre-long (1.5 mi) adit tunnel was completed, involving the excavation of 160,000 cubic metres (5.7 million cubic feet) of hard rock. A tunnel boring machine (TBM), provided by Robbins Company and equipped with 483-millimetre (19.0 in) cutters, was used to bore the adit tunnel over the course of ten months during which it advanced at a rate of 18.5 metres (61 ft) per day.[13][7] During the spring of 2010, work commenced upon the boring of the Ceneri Base Tunnel itself. During March 2010, it was announced that blasting had begun on the main drives of the twin-bores.[14] By the end of the year, the rate of tunneling had reportedly attained its full speed.[citation needed] A combination of conventional drilling and blasting techniques were used to bore approximately 37.49 kilometres (23.30 mi) of the tunnel (including the two main tubes and access tunnels), while the remainder was bored using a TBM.[7]

Breakthrough in the west tube between Sigirino and Vezia occurred on 17 March 2015.[15][16] Breakthrough in the east tube between Sigirino and Vezia occurred on 30 March 2015.[citation needed] On 21 January 2016, breakthrough was achieved in the west bore between Sigirino and Vigana, while the breakthrough in the east bore between Sigirino and Vigana occurred on 26 January 2016.[7] That same day, it was announced that the excavation process had been completed, and the installation of railway infrastructure was the next major stage of the work.[7] During February 2017, the final concrete block was placed in a ceremony marking the tunnel becoming structurally complete.[17]

During August 2013, the Mons Ceneris Consortium, headed by Mancini & Marti, was awarded a Sfr96 million ($103.36 million) contract to provide railway track and logistics for the tunnel.[7] That same month, the Cablex-led CPC Consortium won a Sfr129 million ($138.89 million) contract to provide railway systems and overall tunnel co-ordination services. The planning, supply, installation and commissioning of the tunnel control systems, which are to be controlled from a control centre at Pollegio, has been contracted to Tunnel Control Systems.[7] The awarding of these contracts was not without controversy; a pair of appeals were subsequently upheld by the Federal Supreme Court of Switzerland regarding the awarding process. At one point, it looked as if the completion of the Ceneri Base Tunnel may be delayed as a consequence of legal disputes.[18][19] However, the dispute was settled during September 2014, which unblocked the awarding of contracts as well as allowing for work to proceed.[20]

During 2017 the installation of the track, electrical supply cables, telecommunications and radio systems, automation systems, overhead lines, and various safety and control systems commenced.[7] During August 2017, the first sections of ballastless track were laid in the northern end of the eastern bore.[21] On 30 May 2018, the final railroad tie was laid, meaning that trains can now travel the entire length of the tunnel.[22]

The tunnel was officially opened on 4 September 2020.[23][24][25][26][27] Final testing concluded with a rescue test in October 2020, and routine operations began in December 2020.[28][29][30][6] The construction has cost CHF 2.5bn.[31]

The monthly progress update graphic was available online.[32]

See also

References

  1. ^ "Ceneri Base Tunnel Officially Open Completing the NRLA". 14 December 2020.
  2. ^ a b "Project data – raw construction Gotthard Base Tunnel" (PDF). Lucerne, Switzerland: AlpTransit Gotthard AG. 1 June 2016. Retrieved 15 December 2016.
  3. ^ a b Axe nord-sud du Saint-Gothard (SBB/CFF website).
  4. ^ "Ceneri Base Tunnel". AlpTransit AG. Archived from the original on 28 November 2020. Retrieved 14 April 2016.
  5. ^ "Sommaruga zur Eröffnung des Ceneri-Basistunnels: "Der Tunnel bringt die Schweiz näher zusammen" | NZZ".
  6. ^ a b "Ceneri Base Tunnel Officially Open Completing the NRLA". Railway-News. 14 December 2020. Retrieved 27 December 2020.
  7. ^ a b c d e f g h i j k l m n o "Ceneri Base Tunnel." railway-technology.com, Retrieved: 10 June 2018.
  8. ^ "SBB prepares for Gotthard base tunnel opening." Railway Gazette, 1 May 2015.
  9. ^ "Thales awarded Ceneri Base Tunnel signalling contract." Railway Gazette, 16 September 2016.
  10. ^ "SBB orders rescue trains." Railway Gazette, 7 February 2016.
  11. ^ "Ceneri tunnel start." Railway Gazette, 1 August 2005.
  12. ^ "Ceneri Base Tunnel: Blast-driving the main tunnel from Sigirino begins". AlpTransit Gotthard AG. 10 March 2009. Archived from the original on 15 April 2012. Retrieved 12 November 2011.
  13. ^ "Ceneri Base Tunnel." therobbinscompany.com, Retrieved: 10 June 2018.
  14. ^ "Ceneri base tunnel blasting begins ." Railway Gazette, 30 March 2010.
  15. ^ "Ceneri Base Tunnel: Breakthrough in the west tube between Sigirino and Vezia: AlpTransit Gotthard AG". Archived from the original on 17 March 2015. Retrieved 17 March 2015.
  16. ^ "First Ceneri base tunnel breakthrough." Railway Gazette, 18 March 2015.
  17. ^ "Ceneri rail tunnel moves closer to completing new alpine rail link." thelocal.ch, 8 February 2017.
  18. ^ "Ceneri Base Tunnel: two-year delay possible." Archived 12 June 2018 at the Wayback Machine tunnel-online.info, Retrieved: 10 June 2018.
  19. ^ "Ceneri Base Tunnel: Swiss Supreme Court confirms Railway Infrastructure Awards." tunnel-online.info, June 2014.
  20. ^ "Ceneri base tunnel dispute resolved." Railway Gazette, 14 September 2014.
  21. ^ Barrow, Keith. "Tracklaying begins in Ceneri Base Tunnel." railjournal.com, 1 August 2017.
  22. ^ "AlpTransit history" (PDF). Archived from the original (PDF) on 14 July 2019. Retrieved 14 July 2019.
  23. ^ "Swiss complete trans-European rail route with Ceneri Tunnel under the Alps". Reuters. 4 September 2020 – via www.reuters.com.
  24. ^ "Newly completed Swiss tunnel to transform European rail travel | DW | 04.09.2020". DW.COM.
  25. ^ "Ceneri Base Tunnel inaugurated". Railway Gazette International.
  26. ^ "Ceneri Base Tunnel is officially open". SWI swissinfo.ch.
  27. ^ "Ceneri Base Tunnel inaugurated". 4 September 2020.
  28. ^ "CBT: Switzerland's Third Largest Railway Tunnel Project | Blend Plants". Railway-News. 27 August 2020.
  29. ^ "Ceneri Base Tunnel set for December opening". 8 August 2020.
  30. ^ "Ceneri Base Tunnel: The First Tracks | Blend Plants". Railway-News. 27 August 2020.
  31. ^ "Ceneri train tunnel starts final stage of testing before grand opening". worldradio.ch. 18 August 2020. Archived from the original on 18 August 2020. Retrieved 18 August 2020.
  32. ^ "Archived copy". Archived from the original on 6 February 2016. Retrieved 5 February 2016.{{cite web}}: CS1 maint: archived copy as title (link)

46°07′09″N 8°59′27″E / 46.11917°N 8.99083°E / 46.11917; 8.99083

Read other articles:

In the ShadowPoster filmSutradaraDavid OndříčekDitulis olehMarek EpsteinMisha VotrubaDavid OndříčekPemeranIvan TrojanPenata musikJan P. MuchowMichal NovinskiSinematograferAdam SikoraPenyuntingMichal LánskyTanggal rilis Agustus 2012 (2012-08) Durasi106 menitNegaraRepublik CekoBahasaCekoAnggaranCZK 70 juta In the Shadow (Ceska: Ve stínucode: cs is deprecated ) adalah sebuah film kejahatan Ceko 2012 yqng disutradarai oleh David Ondříček. Film tersebut terpilih sebagao perwa...

 

 

Candi Kedaton adalah nama candi di Indonesia yang bermakna candi kedatuan sekitar 500 meter disebelah selatan Pendopo Agung. secara geografis terletak pada kordinat 112° 22’ 47,1” BT 07° 34’ 13,1” LS. Candi ini terletak di Desa Andung Biru, Tiris, Probolinggo, Jawa Timur, candi Kedaton berbentuk lapik/batur , menghadap ke barat laut yang jarang terjadi di Pulau Jawa , kemungkinan Candi Kedaton menghadap Gunung Semeru atau ke puncak Gunung Hyang. Adapun keunikan Candi Kedaton adalah ...

 

 

Museum Seni Kontemporer Taipei台北當代藝術館Informasi umumJenisMuseumLokasi39 Chang'an West Road, Datong District, Taipei, TaiwanDibuka27 May 2001Situs webwww.mocataipei.org.tw (Tionghoa) Museum Seni Kontemporer Taipei (MoCA Taipei; Hanzi: 台北當代藝術館; Pinyin: Táiběi Dāngdài Yìshùguǎn) merupakan sebuah museum seni kontemporer yang terletak di Kawasan Datong, Taipei, Taiwan. Sejarah Bangunan museum ini dibangun pada masa pemerintahan Jepang pada tahun 1921, yang di kemu...

Gabriel Batistuta Batistuta alla Fiorentina nel 1992 Nazionalità  Argentina Altezza 185 cm Peso 73 kg Calcio Ruolo Allenatore (ex attaccante) Termine carriera 13 marzo 2005 Carriera Giovanili 1987-1988 Newell's Old Boys1989→  Deportivo Italiano Squadre di club1 1988-1989 Newell's Old Boys16 (4)[1]1989-1990 River Plate19 (3)[2]1990-1991 Boca Juniors30 (13)[3]1991-2000 Fiorentina269 (168)2000-2003 Roma63 (30)2003→  Inter...

 

 

1998 Japanese filmCrayon Shin-chan: Blitzkrieg! Pig's Hoof's Secret MissionTheatrical release posterKanjiクレヨンしんちゃん 電撃!ブタのヒヅメ大作戦Revised HepburnKureyon Shinchan: Dengeki! Buta no Hizume Daisakusen Directed byKeiichi HaraScreenplay byKeiichi HaraBased onCrayon Shin-chanby Yoshito UsuiProduced byHitoshi MogiKenji ŌtaTakashi HoriuchiStarring Akiko Yajima Miki Narahashi Keiji Fujiwara Satomi Kōrogi Kotono Mitsuishi Tesshō Genda Mari Mashiba Tamao Hayashi T...

 

 

UCI Oceania Tour Généralités Sport cyclisme sur route Création 2005 Organisateur(s) UCI Éditions 19 (en 2023) Périodicité annuelle Lieu(x) Océanie Participants UCI WorldTeam UCI ProTeam Équipe continentale Statut des participants professionnels Site web officiel uci.org Hiérarchie Hiérarchie Circuits continentaux Niveau supérieur UCI World Tour et UCI ProSeries Palmarès Tenant du titre Classement individuel : Kaden GrovesClassement par équipes : Bolton Equities Black ...

Pour les articles homonymes, voir DPN et DAN. Le diagnostic prénatal (DPN) ou diagnostic anténatal (DAN) est l'ensemble des pratiques médicales ayant pour but de détecter in utero chez l'embryon ou le fœtus une affection grave (anomalie génétique ou malformation congénitale, par exemple), afin de donner aux futurs parents le choix d'interrompre ou non la grossesse et de permettre une meilleure prise en charge médicale de la pathologie si la grossesse est poursuivie. Le diagnostic pr...

 

 

Trinidad Wing, Antilles Air CommandVI fighter Command aircraft in Puerto Rico, 1941Active1941-1944Country United StatesBranch United StatesRoleCommand of air defense unitsMilitary unit The Trinidad Wing, Antilles Air Command is an inactive United States Air Force unit. Its last assignment was with Antilles Air Command at Waller Field, Trinidad. It was disbanded on 15 March 1944. History Engaged in antisubmarine operations. Lineage Constituted as the 6th Interceptor Command on 17 Oc...

 

 

College football game2010 UDrove Humanitarian Bowl14th Humanitarian BowlNew Humanitarian Bowl Logo Northern Illinois Huskies Fresno State Bulldogs (10–3) (8–4) MAC WAC 40 17 Head coach: Tom Matukewicz(interim) Head coach: Pat Hill 1234 Total Northern Illinois 617107 40 Fresno State 7307 17 DateDecember 18, 2010Season2010StadiumBronco StadiumLocationBoise, IdahoMVPQB Chandler Harnish, NIUFavoriteNIU by 1[1]RefereeDan Romeo (Big 12)Attendance25,449PayoutUS$750,0...

Keuskupan WeetebulaDioecesis VeetebulaensisKatolik Gereja Katedral WeetebulaLokasiNegaraIndonesiaWilayah Pulau Sumba, Nusa Tenggara Timur Kabupaten Sumba Barat Kabupaten Sumba Barat Daya Kabupaten Sumba Tengah Kabupaten Sumba Timur Provinsi gerejawiKupangDekanatWeetebulaWaikabubakWaingapu (Sumba Timur)Kantor pusatJl. Eltari, Desa Rada Mata, Kec. Kota Tambolaka, Kab. Sumba Barat Daya 87255Koordinat9°26′41″S 119°13′52″E / 9.444720°S 119.231186°E / -9.444...

 

 

2020年夏季奥林匹克运动会波兰代表團波兰国旗IOC編碼POLNOC波蘭奧林匹克委員會網站olimpijski.pl(英文)(波兰文)2020年夏季奥林匹克运动会(東京)2021年7月23日至8月8日(受2019冠状病毒病疫情影响推迟,但仍保留原定名称)運動員206參賽項目24个大项旗手开幕式:帕维尔·科热尼奥夫斯基(游泳)和马娅·沃什乔夫斯卡(自行车)[1]闭幕式:卡罗利娜·纳亚(皮划艇)&#...

 

 

British counter-intelligence against the Indian revolutionary movement during World War I began from its initial roots in the late-19th century and ultimately came to span in extent from Asia through Europe to the West Coast of the United States and Canada. It was effective in thwarting a number of attempts for insurrection in British India during World War I and ultimately in controlling the Indian revolutionary movement both at home and abroad. Background Main articles: Indian Political In...

 烏克蘭總理Прем'єр-міністр України烏克蘭國徽現任杰尼斯·什米加尔自2020年3月4日任命者烏克蘭總統任期總統任命首任維托爾德·福金设立1991年11月后继职位無网站www.kmu.gov.ua/control/en/(英文) 乌克兰 乌克兰政府与政治系列条目 宪法 政府 总统 弗拉基米尔·泽连斯基 總統辦公室 国家安全与国防事务委员会 总统代表(英语:Representatives of the President of Ukraine) 总...

 

 

Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada Desember 2022. Dara laut merah jambu Sterna dougallii Status konservasiRisiko rendahIUCN22694601 TaksonomiKerajaanAnimaliaFilumChordataKelasAvesOrdoCharadriiformesFamiliLaridaeGenusSternaSpesiesSterna dougallii Montagu, 1813 Tipe taksonomiSterna Distribusi lbs Dara ...

 

 

هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. (يوليو 2022)Learn how and when to remove this message ليو هايدونغ معلومات شخصية الميلاد 28 فبراير 1995 (العمر 29 سنة)شنيانغ  الطول 1.82 م (5 قدم 11 1⁄2 بوصة) مركز اللعب مدافع الجنسية ا...

Calangianus Caragnàni, CalanzànosKomuneComune di CalangianusLokasi Calangianus di Provinsi SassariNegaraItaliaWilayah SardiniaProvinsiSassari (SS)Pemerintahan • Wali kotaFabio AlbieriLuas • Total126,35 km2 (48,78 sq mi)Ketinggian518 m (1,699 ft)Populasi (2016) • Total4,121[1]Zona waktuUTC+1 (CET) • Musim panas (DST)UTC+2 (CEST)Kode pos07023Kode area telepon079Situs webhttp://www.calangianus.it/ Calangianus...

 

 

Canadian poet Lily Alice LefevreLily Alice Lefevre in 1890BornLily Alice Cooke(1854-04-05)5 April 1854Kingston, Canada WestDied17 October 1938(1938-10-17) (aged 84)Vancouver, British ColumbiaGenrePoetry Lily Alice Lefevre (5 April 1854 – 17 October 1938) was a Canadian poet whose writing was closely linked to Vancouver after her arrival there in 1886. Her book of poems, The Lions' Gate, and Other Verses, was the first literary work published by a woman in British...

 

 

乔冠华 中华人民共和国外交部部长 中国人民对外友好协会顾问 任期1974年11月—1976年12月总理周恩来 → 华国锋前任姬鹏飞继任黄华 个人资料性别男出生(1913-03-28)1913年3月28日 中華民國江蘇省盐城县逝世1983年9月22日(1983歲—09—22)(70歲) 中华人民共和国北京市籍贯江蘇鹽城国籍 中华人民共和国政党 中国共产党配偶明仁(1940年病逝) 龚澎(1970年病逝) 章含�...

Church in New ZealandSt Alban's ChurchSt Alban's Church41°6′25″S 174°55′4″E / 41.10694°S 174.91778°E / -41.10694; 174.91778Address4 Paekakariki Hill Road, Pāuatahanui, PoriruaCountryNew ZealandDenominationAnglicanWebsitewww.pauanglican.org.nzHistoryStatusChurchDedicated1898ArchitectureArchitect(s)Clere, Fitzgerald, RichmondArchitectural typeChurchStyleGothic RevivalYears built1895-1898AdministrationProvinceAnglican Church in Aotearoa, New Zealand and Poly...

 

 

Resistance, Rebellion, and Death First US editionAuthorAlbert CamusLanguageFrenchPublisherAlfred A. Knopf (US)Hamish Hamilton (UK)Publication date1961 Resistance, Rebellion, and Death (French: Lettres à un ami allemand, Letters to a German Friend) is a 1960 collection of essays written by Albert Camus and selected by the author prior to his death. The essays here generally involve conflicts near the Mediterranean, with an emphasis on his home country Algeria, and on the Algerian War of Indep...