The southernmost 13.6 km (8.5 mi) section was narrow-sealed, the northernmost 101.4 km (63.0 mi) section (between south of Beagle Bay and its northern terminus) was sealed, and the middle 90 km (56 mi) section was unsealed.[1] During the wet season, the unsealed section was often closed because flooding made it impassable.
The road is vital for servicing communities on the Dampier Peninsula and is also a popular tourist attraction. The road is maintained by the Shire of Broome.
Upgrades
In May 2018, Main Roads Western Australia, an agency of the Government of Western Australia, started work to upgrade and seal Cape Leveque Road between Broome Highway and Beagle Bay.[3][4] This work was funded under the Northern Australia Roads Program, with $65.7 million from the state and federal governments, and was completed in late 2020.[5] It included both reconstruction and sealing of the southernmost section of narrow-seal and construction and sealing of the middle, previously unsealed, section.[1]
^"Broome - Cape Leveque Road". Department of Infrastructure, Transport, Regional Development and Communications. 16 November 2020. Retrieved 30 March 2022.