Bridge near Limyra

Bridge near Limyra
The 4th arch, today half-buried. The exceptionally flat profile of the arch is evident.
Coordinates36°20′56″N 30°12′23″E / 36.34887°N 30.20651°E / 36.34887; 30.20651
CarriesPedestrian and pack animal traffic
CrossesAlakır Çayı
LocaleLimyra, Lycia, Turkey
Official nameKırkgöz Kemeri
Heritage statusNone
Characteristics
DesignSegmental arch bridge
MaterialBrick, stonemasonry and rubble
Total length360 m (1,181.1 ft)
Width3.55–4.30 m (11.6–14.1 ft)
Longest span14.97 m (49.1 ft)
No. of spans28 (once 27)
Piers in waterToday approx. 5
Load limit30 t + 500 kp/m²
History
Construction endPresumably 3rd century AD
Location
Map

The Bridge near Limyra (in Turkish: Kırkgöz Kemeri, "Bridge of the Forty Arches") is a late Roman bridge in Lycia, in modern south-west Turkey, and one of the oldest segmented arch bridges in the world. Located near the ancient city of Limyra, it is the largest civil engineering structure of antiquity in the region, spanning the Alakır Çayı river over a length of 360 m (1,181.1 ft) on 26 segmental arches. These arches, with a span-to-rise ratio of 5.3:1, give the bridge an unusually flat profile, and were unsurpassed as an architectural achievement until the late Middle Ages. Today, the structure is largely buried by river sediments and surrounded by greenhouses. Despite its unique features, the bridge remains relatively unknown, and only in the 1970s did researchers from the Istanbul branch of the German Archaeological Institute carry out field examinations on the site.

Field examinations

Ancient paving stones. View to the east, along the greenhouses

No information on the bridge survives from ancient sources. The first descriptions appear in European travellers' accounts from the 19th century. The British archaeologist Charles Fellows was the first to explore the region of Lycia, and visited the bridge in May 1840. Fellows, as well as T.A.B. Spratt and Edward Forbes, who visited the site two years later, describe it as having 25 arches.[1] In 1882, an Austrian expedition, including Otto Benndorf, interpreted the structure as part of an ancient road that connected Limyra with the city of Attaleia (modern Antalya) to the east. However, this mission failed to produce any plans or sketches of the site.[1]

The first, and as of 2008 only scientific examination of the bridge was undertaken by the German archaeologists Wolfgang W. Wurster and Joachim Ganzert in two successive days in September 1973, and completed through further visits in subsequent years.[1] Their findings were published in 1978 in the Archäologischer Anzeiger journal of the German Archaeological Institute, with the express intent of bringing the imperiled state of the hitherto almost intact bridge into the spotlight:[2]

Recently, citrus fruit plantations were created in this fertile bottomland; greenhouses for early vegetables are now being built east of the bridge. The bridge is greatly endangered through the beginning of intensive cultivation in the vicinity. The locals strip the still intact bridge surface for stones; bulldozers employed to build irrigation canals rip the structure apart and crush the stone pavement with their caterpillar tracks.

In 1993, the civil engineer Colin O'Connor summarized their report in his English-language monograph on Roman bridges, and also emphasized the exceptional character of this bridge.[3] No further scientific examinations of the Limyra Bridge are known.

Location and situation

The rather modest Alakır Çayı, flowing under the 1st segmented arch.

The bridge crosses the Alakır Çayı stream, whose ancient name is unknown, 3.2 km (2.0 mi) east of the ruins of Limyra (distance measured from the city's theatre) and 3.8 km (2.4 mi) north of the modern coastline, close to the modern road from Turunçova to Kumluca.[1] The local topography is dominated by the foothills of the Toçak Dağı mountains, which blend here with the alluvial bottomlands of the Bay of Finike.[1] In this transitional area, the bridge was built immediately above the point where the narrow river valley opens into the wide estuary plain, and where the crossing of the river during the rain period would be obstructed by high water.[4] While the eastern end of the bridge levels off at the gravel plain, the western end abuts directly to the rising rock wall of the mountain, presumably for protection against floods.[5] The resulting sharp bend in the course of the road could also be exploited in case of need to block the road. A modern dam, Alakır Barajı, was constructed upstream for irrigation purposes and flood protection.[5]

Lycia did not, in contrast to other Roman provinces, possess a very developed road system. While the north–south traffic was conducted primarily through the few river valleys, the east–west routes led, unlike today, mostly on and along the mountain ridges.[6] This particular road, leading from Limyra over the Alakır Çayı and into the neighbouring region of Pamphylia and Attaleia, must have been of special importance, since the two regions were united in a single province, Lycia et Pamphylia, until the 4th century. In comparison to the main arterial roads of the Roman Empire however, the roads of Lycia were, with 3–4 m (9.8–13.1 ft) width, rather modest and confined to pedestrian and pack animal traffic.[6] This is further corroborated by the fact that no wagon ruts are evident on the paving of the Limyra bridge, nor any traces of a parapet or breastwork.[7]

Construction

The 1st arch seen from the south.

With a length of 360 m (1,181.1 ft), the Limyra Bridge qualifies as the largest surviving engineering achievement of antiquity in Lycia.[8] The bridge stands on 26 uniform segmental arches consisting of a double, radially laid course of bricks.[9] At the eastern end, the original 27th arch has been replaced by two smaller, semicircular arches of later construction. The latter are built with a single course of bricks. Traces of the original, flat beginning of the collapsed arch are still visible on the piers.[9]

At the time of Wurster's and Ganzert's visit to the site, the entire bridge was buried by river sediments up to the springing line of the vaults. No efforts to dig them up were undertaken by Wurster and Ganzert.[5] Only two of the 28 arches were exposed enough so that direct measurements of the clear span and the pier width could be undertaken. It was, however, possible to calculate the dimensions of the remaining bays from their exposed sections.[10]

Architecture

Arches and piers

Dimensions of a typical segmental arch

The spans of the arches ranged from 11.60 m (38.1 ft) to 14.97 m (49.1 ft) (arches 2 and 26 respectively).[9] Based on the size of the spans, one can distinguish four groups, with the following median values:[9]

  • 11.60–12.30 m (38.1–40.4 ft) for four arches (Nos. 2, 3, 7, 21)
  • 12.75 m (41.8 ft) for fourteen arches (Nos. 5, 9–15, 17–19, 22–24)
  • 13.10 m (43.0 ft) for four arches (Nos. 1, 4, 6, 8)
  • 13.60 m (44.6 ft) for three arches (Nos. 16, 20, 25)

The reason for this grouping is unclear; they certainly cannot be attributed to an attempt to match the lay of the river bed. The differences however could point to the repeated use of differently-sized falsework structures in the construction of the barrel vaults (see animation below).[11]

Only in a single case, between arches 26 and 27, were Wurster and Ganzert able to determine the breadth of a pier: 2.10 m (6.9 ft). Subtracting this value from the common arch span of 12.75 m (41.8 ft), a clear span of 10.65 m (34.9 ft) remains.[12] Since all arches have a rise of ca. 2 m (6.6 ft), the Limyra Bridge has an unusually large span-to-rise ratio of 5.3 to 1. Such flattened arches were very rare at the time for stone bridges, and were not matched and surpassed until the reappearance of segmental arch bridges in 14th century Italy. For the largest arch in the Limyra Bridge, the ratio is even greater, spanning a width 6.4 times its height.[12] The two later arches, in contrast, are, with a ratio of 2.7:1, quite ordinary semi-circular arches.[12]

Height

Arches 8 and 9, south side, silted up to the level of the arch abutments.

The total height of the bridge could not be determined because most of the structure is silted up. However, the distance between the arches' abutments and the pavement surface could be determined at only 3.25 m (10.7 ft).[13]

The surface level is almost horizontal: the roadway lies at a height of 20.05–20.55 m (65.8–67.4 ft) above sea level between arches 1 to 20, and falls slightly in its eastern section, between arches 21 and 26 to a level of 19.94 to 19.66 m (65.4 to 64.5 ft).[14] Since there is no indication of a later sinking of the structure, this nearly uniform height indicates careful levelling and the existence of solid pier foundations.[15] In contrast, the lengthwise axis of the bridge displays often significant deviations from arch to arch.[15]

Statics

Remarkably, the support line of the structure's dead load is almost identical with the curve of the vault arch.[16] The statical analysis of the bridge proves the structure's great load capacity:

In modern classification, the bridge would be able to support loads of a Class 30 bridge (per DIN 1072); this would mean, that it could support a 30-tonne vehicle on one arch and additionally on the remaining surface of the arch a load of 500 kp/m². The bridge was thus very safe for ancient traffic.[17]

Materials

The Limyra bridge was built in a composite manner of brick, stonemasonry, and rubble.

Arches

Arch closeup: double layer of bricks bound with mortar.

The bricks of the segmental arches are made of yellow-red clay, mixed with fine brick fragments. The bricks are rectangular plates, measuring ca. 40 cm × 50 cm (15.7 in × 19.7 in) and 5 cm (2.0 in) thick. They are placed with the shorter side upright facing outwards, so that the total thickness of the arches measures ca. 80 cm.[12] The bricks are bound with grout of lime mortar mixed with brick shards and fine gravel, forming 4 cm (1.6 in)-thick joints. The two later semi-circular arches were built with smaller bricks, although surviving bricks from the original arch were re-used at places.[12] The abutment stones are dressed limestone ashlar blocks, and form a sloping surface to support the arches.

The double-layer technique facilitated a more effective use of the falsework, since they could be removed and used elsewhere as soon as the lower course was finished:

The construction of the two layers of the double brick-arches in two separate phases had two advantages. In the first phase, the falsework only had to carry the weight of the lower course, so that it could itself be of lighter construction. In the second phase, the weight of the upper layer could be already borne by the lower vault; the falsework was thus already available for use in a different arch.[17]

Hypothetical workflow on the bridge: the falsework was moved to another opening as soon as the lower arch rib had been completed.
Pavement with projecting corbel stone at the 3rd arch, south side

Superstructure

As far as can be determined, between arches 2 to 21, the outer facing of the superstructure consists of four layers of brick, followed by layers of rough stonemasonry bound with mortar.[18] In contrast, between arches 22 and 26, as well as in both ramps on either end, the facing consists of ashlar blocks.[7] The two repaired arches 27a and 27b are differentiated from the earlier work through the use of smaller unworked stones and the incorporation of irregularly placed brick tiles.[7] In arch 26, the lower side of the arch still features a projecting bearing used for the placement of the falsework.[18]

The interior of the superstructure consists of a combination of unworked masonry blocks and large river boulders, bound with lime mortar.[18]

Pavement

The bridge surface is located only 30–40 cm (11.8–15.7 in) over the arches' apex, is 3.55–3.70 m (11.6–12.1 ft) wide, increasing towards either end at 4.30 m (14.1 ft) and projects ca. 10 cm (3.9 in) over the superstructure on either side.[7] It is paved with large and irregular limestone cobblestones, although smaller pebbles have been used in the repairs at the two semicircular arches.[7]

Dating

The exact chronological placement of the Limyra bridge is difficult due to its unique place within Roman engineering tradition and the lack of comparable structures.[17] Wurster and Ganzert used following characteristics as a starting point:[19]

  • multiple arches of same width, and horizontal deck level with only small-gradient ramps on either end
  • very flat segmental arches built with double, radially layered brick courses
  • the use of mortar in the stonework
  • exterior facing primarily rough masonry with interspersed bricks, partly dressed ashlar blocks
  • exceptionally large paving stones.

In contrast to these, most Roman stone bridges were faced with ashlar and rested on voussoir arches,[20] a method which is dominant in other vaulted structures in Lycia too.[21] Compared to the massive and tall semicircular-arched bridges that are typical of Roman architecture, the Limyra bridge, with its flat segmented arches, offers a markedly lower and more elongated appearance,[22] so that Wurster and Ganzert offer a "provisional" late dating, approximately during the reign of emperor Justinian I in the 6th century, during which the use of mixed brick and stone is attested in other structures of the region.[23]

On the other hand, this mixed technique is already present in the 3rd-century AD aqueduct of Aspendos, and the Romans certainly knew how to build segmented-arched bridges, as attested by surviving examples, three of which are listed by Wurster and Ganzert themselves.[24] An earlier construction date in the 2nd or 3rd centuries AD cannot therefore be excluded.[25] The case for an earlier construction date has been strengthened in recent years with the discovery of further seven Roman segmented arch bridges.[26] The remnants of the nearby Kemer Bridge over the river Xanthos, which dates to the 3rd century and has some architectural similarities with the Limyra bridge, could further reinforce that case.[27]

See also

References

  1. ^ a b c d e Wurster & Ganzert 1978, p. 288
  2. ^ Wurster & Ganzert 1978, pp. 289–290
  3. ^ O’Connor 1993, p. 126:

    Wurster and Ganzert describe the remarkable bridge near Limyra… The outstanding feature of the bridge is that the arches are segmental… It is believed that the bridge is Roman. If this is the case, then it is one of the few truly segmental Roman stone arch bridges, …

  4. ^ Wurster & Ganzert 1978, pp. 288f.
  5. ^ a b c Wurster & Ganzert 1978, p. 289
  6. ^ a b Wurster & Ganzert 1978, p. 303
  7. ^ a b c d e Wurster & Ganzert 1978, p. 295
  8. ^ Wurster & Ganzert 1978, pp. 288, 291
  9. ^ a b c d Wurster & Ganzert 1978, p. 291
  10. ^ Wurster & Ganzert 1978, p. 290
  11. ^ Wurster & Ganzert 1978, pp. 291f.
  12. ^ a b c d e Wurster & Ganzert 1978, p. 292
  13. ^ Wurster & Ganzert 1978, pp. 292, fig. 5, 295
  14. ^ Wurster & Ganzert 1978, pp. 295f.
  15. ^ a b Wurster & Ganzert 1978, p. 296
  16. ^ Wurster & Ganzert 1978, p. 297
  17. ^ a b c Wurster & Ganzert 1978, p. 299
  18. ^ a b c Wurster & Ganzert 1978, p. 293
  19. ^ Wurster & Ganzert 1978, pp. 299ff.
  20. ^ Wurster & Ganzert 1978, p. 301
  21. ^ Wurster & Ganzert 1978, p. 300, note 10
  22. ^ Wurster & Ganzert 1978, pp. 301ff.
  23. ^ Wurster & Ganzert 1978, p. 302
  24. ^ Wurster & Ganzert 1978, pp. 302–307
  25. ^ Wurster & Ganzert 1978, p. 300
  26. ^ O’Connor 1993, p. 171
  27. ^ Wurster & Ganzert 1978, pp. 304–307

Sources

  • O’Connor, Colin (1993), Roman Bridges, Cambridge University Press, pp. 126 (E23), ISBN 0-521-39326-4
  • Wurster, Wolfgang W.; Ganzert, Joachim (1978), "Eine Brücke bei Limyra in Lykien" [A bridge at Limyra in Lycia], Archäologischer Anzeiger (in German), Berlin: German Archaeological Institute, pp. 288–307, ISSN 0003-8105

Media related to Bridge near Limyra at Wikimedia Commons

Read other articles:

Artikel ini perlu diwikifikasi agar memenuhi standar kualitas Wikipedia. Anda dapat memberikan bantuan berupa penambahan pranala dalam, atau dengan merapikan tata letak dari artikel ini. Untuk keterangan lebih lanjut, klik [tampil] di bagian kanan. Mengganti markah HTML dengan markah wiki bila dimungkinkan. Tambahkan pranala wiki. Bila dirasa perlu, buatlah pautan ke artikel wiki lainnya dengan cara menambahkan [[ dan ]] pada kata yang bersangkutan (lihat WP:LINK untuk keterangan lebih lanjut...

 

American country music duo Brooks & DunnRonnie Dunn (left) and Kix Brooks (right) in March 2017Background informationOriginNashville, Tennessee, U.S.GenresNeotraditional country[1]Years active1990–2010, 2015–presentLabelsArista NashvilleMembersKix BrooksRonnie DunnWebsiteBrooks-Dunn.com Brooks & Dunn are an American country music duo consisting of Kix Brooks and Ronnie Dunn, both of whom are vocalists and songwriters. The duo was founded in 1990 through the suggest...

 

Stimulant drug SCH-5472Identifiers IUPAC name 2-benzhydryl-1-methyl-piperidin-3-ol CAS Number20068-90-0 Y (phenylsuccinate)PubChem CID209634ChemSpider181634 NUNII2D4V6AWP8NCompTox Dashboard (EPA)DTXSID50942087 Chemical and physical dataFormulaC19H23NOMolar mass281.399 g·mol−13D model (JSmol)Interactive image SMILES OC(CCCN1C)C1C(C2=CC=CC=C2)C3=CC=CC=C3 InChI InChI=1S/C19H23NO/c1-20-14-8-13-17(21)19(20)18(15-9-4-2-5-10-15)16-11-6-3-7-12-16/h2-7,9-12,17-19,21H,8,13-14H2,1H3...

Third most important fish in aquaculture after carp and salmon TilapiaAquaculture production of tilapia by speciesin million tonnes as reported by the FAO, 1950–2009[1]Aquaculture production of tilapia by countryin million tonnes as reported by the FAO, 1950–2009[1] Tilapia has become the third most important fish in aquaculture after carp and salmon; worldwide production exceeded 1.5 million metric tons (1.5×10^6 long tons) in 2002[2] and increases annually....

 

Menjadi DiaSingel promosi oleh Tiara Andinidari album Tiara AndiniDirilis17 Desember 2021 (2021-12-17)GenrePopbaladaDurasi3:49LabelUniversal Music IndonesiaPenciptaArsy WidiantoProduserYovie WidiantoAdrian KitutDaftar lagu Tiara Andini8 lagu Menjadi Dia Maafkan Aku #terlanjurmencinta Buktikan Merasa Indah Hadapi Berdua Gemintang Hatiku Janji Setia 365 Video musikMenjadi Dia di YouTube Menjadi Dia adalah lagu dari penyanyi Indonesia, Tiara Andini. Lagu ini dirilis pada 17 Desember 2021 se...

 

1813 battle during the War of the Sixth Coalition For the Thirty Years' War battle, see Battle of Leipzig (1642). Battle of the Nations redirects here. For other uses, see Battle of the Nations (disambiguation). Battle of the NationsPart of the German campaign of the Sixth CoalitionBattle of Leipzig by Vladimir MoshkovDate16–19 October 1813LocationLeipzig, Kingdom of Saxony51°20′N 12°23′E / 51.333°N 12.383°E / 51.333; 12.383Result Coalition victoryTerritorial...

Administrative division of Taiwan under Japanese rule Taihoku Prefecture臺北州Taihoku-shū1920-1952Taihoku Prefecture government building(now the Control Yuan building)CapitalTaihoku CityArea • 19414,594.24 km2 (1,773.85 sq mi)Population • 1941 1,140,530 Historical eraTaiwan under Japanese rule• Established September 1920• Kīrun upgraded to city 1924• Gilan upgraded to city 1940• Disestablished October 25 1945• Japa...

 

Chronologies Données clés 1859 1860 1861  1862  1863 1864 1865Décennies :1830 1840 1850  1860  1870 1880 1890Siècles :XVIIe XVIIIe  XIXe  XXe XXIeMillénaires :-Ier Ier  IIe  IIIe Chronologies géographiques Afrique Afrique du Sud, Algérie, Angola, Bénin, Botswana, Burkina Faso, Burundi, Cameroun, Cap-Vert, République centrafricaine, Comores, République du Congo, République démocratique du Congo, Côte d'Ivoire, Djibouti, Égyp...

 

City in Egypt For the Tanzanian city, see Dar es Salaam. For the Southeast Asian Country, see Brunei Darussalam. For other uses, see Dar al-Salam. This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Dar El Salam – news · newspapers · books · scholar · JSTOR (September 2010) (Learn how and when to remove this mes...

Motor vehicle Renault EstafetteOverviewManufacturerRenaultAlso calledRenault Hi-Boy (USA, Canada)Renault Petit-Panel (USA, Canada)Dacia D6 Estafette (Romania)[1]Production1959–1980 (France)1965–1969 (Algeria)1975–1978 (Romania)1964–1986 (Mexico)[citation needed]AssemblyAlgeria: Algiers (CARAL)France: Boulogne Billancourt, ParisMexico: Ciudad Sahagún (DINA)Romania: Mioveni (Dacia)Body and chassisClassLight commercial vehicle (M)Body style4-door minibus3-/4-d...

 

Northeastern African civilization Not to be confused with Ancient Egypt (magazine) or Ancient Egyptians (TV series). Ancient Egyptian and Ancient Egyptians redirect here. For the language, see Egyptian language. Ancient Egyptc. 3150 BC–332/30 BC[a]Map of ancient Egypt, showing major cities and sites of the Dynastic period (c. 3150 BC to 30 BC)Capitalsee List of historical capitals of EgyptHistorical eraAncient history• Established c. 3150 BC• Early Dy...

 

History of the Argentina national team at the World Cup For the women's team, see Argentina at the FIFA Women's World Cup. Argentina celebrating their victory in the 1986 FIFA World Cup final in Mexico This is a record of Argentina's results at the FIFA World Cup. Argentina is one of the most successful teams in the tournament's history, having won three World Cups: in 1978, 1986, and 2022. Argentina has also been runner-up three times: in 1930, 1990 and 2014. In 18 World Cup tournaments, Arg...

Situación legal de las uniones entre personas del mismo sexo en América Central y el Caribe      Matrimonio      Otro tipo de unión      Convivencia no registrada      Sin reconocimiento      Matrimonio prohibido para parejas del mismo sexo      País sujeto al pronunciamiento OC 24/17 de la CIDH      Actividad LGBT i...

 

American-born ornamental painter and craftsman John Samuel Blunt (March 17, 1798 - August 1835) was a 19th-century American-born ornamental painter, calligrapher and craftsman. Blunt is best known for his seascapes and work in portraiture. Prior to the 21st century, Blunt has been identified as the “Borden Limner”, a name coined by art historian Robert Bishop and given to Blunt for his famed portraits of sea captain Daniel Borden and his wife.[1] Blunt's work with landscape predat...

 

Ferdinand OmanyalaNazionalità Kenya Atletica leggera SpecialitàVelocità Record 60 m 652 (indoor - 2024) 100 m 977 (2021) 150 m 1489 (2023) 200 m 2033 (2022) 4×100 m 3826 (2023) CarrieraNazionale 2017- Kenya Palmarès Competizione Ori Argenti Bronzi Campionati africani 2 0 0 Giochi del Commonwealth 1 0 0 Vedi maggiori dettagliStatistiche aggiornate al 2023 Modifica dati su Wikidata · Manuale Ferdinand Omanyala Omurwa (Nairobi, 2 gennaio 1996) è un velocista keniota, detento...

Adhi Makayasa (bahasa Sanskerta: आदि माख्यास) adalah penghargaan tahunan bagi lulusan terbaik dari setiap matra TNI dan POLRI, yaitu Matra Darat dari Akademi Militer Magelang, Matra Laut dari Akademi Angkatan Laut Surabaya, Matra Udara dari Akademi Angkatan Udara Yogyakarta), dan Matra Kepolisian dari Akademi Kepolisian Semarang. Penerima penghargaan ini adalah mereka yang secara seimbang mampu menunjukkan prestasi terbaik di tiga aspek: akademis, jasmani, dan kepribadian ...

 

There is also Clyde Township, Allegan County, Michigan. Civil township in Michigan, United StatesClyde Township, MichiganCivil townshipLocation within St. Clair CountyClyde TownshipLocation within the state of MichiganCoordinates: 43°02′20″N 82°35′17″W / 43.03889°N 82.58806°W / 43.03889; -82.58806CountryUnited StatesStateMichiganCountySt. ClairOrganized1836Government • SupervisorErnie ManoleasArea • Total36.0 sq mi (93.2...

 

東ケープ州 州 Mpuma-KoloniOos-Kaap provinseEastern Cape Province 東ケープ州の位置国  南アフリカ共和国州 東ケープ州州都 ビショ(バッファローシティ)最大都市 ポート・エリザベス設立 1994年4月27日政府 • 州首相 オスカー・ムブヤネ (アフリカ民族会議)面積 • 合計 168,966 km2人口(2022年)[1] • 合計 7,230,204人 • 密度 43人/km2等時帯 UTC...

2016 film The Beautiful Days of AranjuezFilm posterDirected byWim WendersScreenplay byWim WendersBased onLes Beaux Jours d'Aranjuezby Peter HandkeProduced byPaulo BrancoGian-Piero RingelStarringReda KatebSophie SeminJens HarzerNick CaveCinematographyBenoît DebieEdited byBeatrice BabinProductioncompaniesAlfama FilmsNeue Road MoviesRelease dates 1 September 2016 (2016-09-01) (Venice) 5 October 2016 (2016-10-05) (France) 24 November 2016 (201...

 

2021 shooting in Germany On September 18, 2021, a fatal attack with a firearm on the 20-year-old employee of a gas station was carried out in Idar-Oberstein, Germany. The perpetrator, a 49-year-old man, had been requested by the employee to wear his surgical mask as mandated by the German government in response to the COVID-19 pandemic. The shooting received a lot of public attention and was related by some to the increasing radicalization of the so-called Querdenken movement[1][2...