This train runs via Secunderabad, Warangal and Vijayawada. The table shows the list of stations between the two nodal stations.[4] The train was extended up to Bidar from 1 March 2018. From 2022, the route has been electrified till Bidar and operational. A WAP7 or WAP4 is used to haul this Superfast express 12749/50 from BIDAR to MACHELIPATNAM and back.