The 2005 Base Realignment and Closure Commission preliminary list was released by the United States Department of Defense on May 13, 2005. It was the fifth Base Realignment and Closure ("BRAC") proposal generated since the process was created in 1988. It recommended closing 22 major United Statesmilitary bases and the "realignment" (either enlarging or shrinking) of 33 others. On September 15, 2005, President George W. Bush approved the BRAC Commission's recommendations, leaving the fate of the bases in question to the United States Congress. Congress had a maximum of 45 days to reject the proposal by passing a joint resolution of disapproval, or the recommendations automatically enter into effect. Such a resolution (H.J.Res. 65) was introduced to the House of Representatives on September 23, 2005, by Rep. Ray LaHood (R-IL) (no such resolution was introduced in the Senate). The House took up debate of the resolution on October 26, 2005. The resolution failed to pass by a 324–85 margin, thereby enacting the list of recommendations.[1] The Secretary of Defense was required to begin implementing the recommendations by September 15, 2007, and to complete implementation no later than September 15, 2011.
Pentagon officials calculated that, if adopted in full by the nine-member BRAC Commission, the recommendations would have saved almost $50 billion over 20 years. The BRAC Commission (officially known as the Defense Base Closure and Realignment Commission) disputed this claim, pointing out what it considered to be significant flaws in the Department's methodology. The Commission recalculated the 20-year savings of the DOD recommendation list at just above $37 billion. Between late May and late August, the Commission reviewed the list and amended many of the Pentagon's recommendations, removing several major installations from the closure list. The Commission calculated the overall 20-year savings to the government in carrying out its amended list of recommendations as close to $15 billion.
rearrange forces to be able to act around the globe
make the military more flexible and agile
improve cooperation between military service branches while training and fighting
convert unneeded capacity into warfighting capability
The 2005 BRAC round was the fifth since the process was initiated in 1988, and the first since 1995. It differed significantly from preceding rounds in several respects:
It was the first with a nine-member commission (the 1991, 1993, and 1995 commissions had eight members)
It was the only stand-alone round authorized by Congress (the 1988 BRAC round was initiated by the Secretary of Defense, and the 1991–1995 rounds were authorized together in the Defense Base Closure and Realignment Act of 1990)
It was the first BRAC round focused on military force transformation, not infrastructure reduction
It was the only round as part of a worldwide defense infrastructure review including U.S. installations overseas
It was the first BRAC to impact the National Guard such that, several states filed legal proceedings to stay or have recommendations thrown out
Recommendations
Major facilities slated for closure included these:
By merging adjacent installations belonging to different services, 13 Joint Bases were created.
Results
The 2005 Base Realignment and Closure Commission resulted in a $35 billion increase in military spending, partly due to building new facilities. The military claimed, however, that it also resulted in a $4 billion reduction in annual spending.[5]